Wind power plant · Crockett, TX
White Mesa Wind
White Mesa Wind is a 501 MW wind power plant in Crockett County, Texas, operated by White Mesa Wind, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 1.8 TWh, about what 135,000 average Texas homes use in a year.
White Mesa Wind in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 6th largest, about 1.1% of the state's 45 GW of wind capacity.
Crockett County has 3 power plants of 1 MW or more with 1.1 GW in all; White Mesa Wind is 45% of that and the largest of 3 wind plants there.
Its capacity factor of 41% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Crockett County goes 6.9 hours a year without power, the 169th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
White Mesa Wind (outlined) and other plants in Crockett County, shaded. 30.910, -101.263.
Plant facts
- Operator
- White Mesa Wind, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Crockett County, TX
- EIA plant ID
- 64710
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WM001 | Onshore Wind Turbine | 501 MW | 2021 | – |
Nearby
Other plants in Crockett County
Questions
White Mesa Wind, answered
How much power does White Mesa Wind produce?
White Mesa Wind has 501 MW of capacity from one generator. In 2025 it generated 1.8 TWh, 41% of the most it could have made running flat out all year (its capacity factor).
How many homes does White Mesa Wind power?
Its 2025 output of 1.8 TWh equals the yearly electricity use of about 135,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is White Mesa Wind?
White Mesa Wind is in Crockett County, Texas, at about 30.910°, -101.263°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Crockett County goes 6.9 hours a year without power, the 169th most of 240 counties in Texas. The county's page has the full outage record.
Who operates White Mesa Wind?
It is operated by White Mesa Wind, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did White Mesa Wind open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.