Wind power plant · Cochran, TX
Wildcat Ranch Wind Project
Wildcat Ranch Wind Project is a 150 MW wind power plant in Cochran County, Texas, operated by Wildcat Ranch Wind Project, LLC. Its oldest generator still running came online in 2018. In 2025 it generated 652 GWh, about what 49,000 average Texas homes use in a year.
Wildcat Ranch Wind Project in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 157th largest, about 0.3% of the state's 45 GW of wind capacity.
Its capacity factor of 50% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Cochran County goes 3.5 hours a year without power, the 217th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Wildcat Ranch Wind Project (outlined) and other plants in Cochran County, shaded. 33.530, -102.962.
Plant facts
- Operator
- Wildcat Ranch Wind Project, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Cochran County, TX
- EIA plant ID
- 61674
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WT | Onshore Wind Turbine | 150 MW | 2018 | – |
Questions
Wildcat Ranch Wind Project, answered
How much power does Wildcat Ranch Wind Project produce?
Wildcat Ranch Wind Project has 150 MW of capacity from one generator. In 2025 it generated 652 GWh, 50% of the most it could have made running flat out all year (its capacity factor).
How many homes does Wildcat Ranch Wind Project power?
Its 2025 output of 652 GWh equals the yearly electricity use of about 49,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Wildcat Ranch Wind Project?
Wildcat Ranch Wind Project is in Cochran County, Texas, at about 33.530°, -102.962°. The average electricity customer in Cochran County goes 3.5 hours a year without power, the 217th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Wildcat Ranch Wind Project?
It is operated by Wildcat Ranch Wind Project, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Wildcat Ranch Wind Project open?
Its oldest generator still running came online in 2018.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.