Solar power plant · Tallahatchie, MS

Wildwood Solar Plant

Wildwood Solar Plant is a 100 MW solar power plant in Tallahatchie County, Mississippi, operated by Wildwood Solar, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 23 GWh, about what 1,600 average Mississippi homes use in a year.

Capacity100 MWNameplate, September 2026
Generated23 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Wildwood Solar Plant in context

Among the 25 solar plants in Mississippi in the EIA's inventory, it is the 9th largest, about 5.3% of the state's 1.9 GW of solar capacity.

The average electricity customer in Tallahatchie County goes 23 hours a year without power, the 14th most of 74 counties in Mississippi. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Wildwood Solar Plant (outlined) and other plants in Tallahatchie County, shaded. 33.935, -90.339.

Plant facts

Operator
Wildwood Solar, LLC
Sector
IPP Non-CHP
Grid operator
MISO
County
Tallahatchie County, MS
EIA plant ID
68516
Where Mississippi's power comes from → Mississippi power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
WLD Solar Photovoltaic 100 MW 2025 –

Questions

Wildwood Solar Plant, answered

How much power does Wildwood Solar Plant produce?

Wildwood Solar Plant has 100 MW of capacity from one generator. In 2025 it generated 23 GWh.

How many homes does Wildwood Solar Plant power?

Its 2025 output of 23 GWh equals the yearly electricity use of about 1,600 average Mississippi homes (1,184 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Wildwood Solar Plant?

Wildwood Solar Plant is in Tallahatchie County, Mississippi, at about 33.935°, -90.339°. The average electricity customer in Tallahatchie County goes 23 hours a year without power, the 14th most of 74 counties in Mississippi. The county's page has the full outage record.

Who operates Wildwood Solar Plant?

It is operated by Wildwood Solar, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.

When did Wildwood Solar Plant open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Mississippi home's 1,184 kWh a month in 2025. Methodology.