Oil power plant · Cottonwood, MN

Windom

Windom is a 12 MW oil power plant in Cottonwood County, Minnesota, operated by City of Windom (MN). Its oldest generator still running came online in 2001.

Capacity12 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators5Oldest from 2001

Windom in context

Among the 73 other-fuel plants in Minnesota in the EIA's inventory, it is the 27th largest, about 1.0% of the state's 1.1 GW of other-fuel capacity.

Cottonwood County has 7 power plants of 1 MW or more with 301 MW in all; Windom is 4% of that and the largest of 2 oil plants there.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0001111201820212023GWh 0
00011112018202120230

Where it is

Windom (outlined) and other plants in Cottonwood County, shaded. 43.868, -95.114.

Plant facts

Operator
City of Windom (MN)
Sector
Electric Utility
Grid operator
MISO
County
Cottonwood County, MN
EIA plant ID
2023
Where Minnesota's power comes from → Minnesota power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CAT5 Petroleum Liquids 3.1 MW 2024 –
CAT6 Petroleum Liquids 3.1 MW 2024 –
CAT2 Petroleum Liquids 1.8 MW 2001 –
CAT3 Petroleum Liquids 1.8 MW 2001 –
CAT4 Petroleum Liquids 1.8 MW 2001 –

Retired

GeneratorTechnologyCapacityOnlineRetired
GT1Petroleum Liquids3.0 MW19802022

Nearby

Other plants in Cottonwood County

Questions

Windom, answered

How much power does Windom produce?

Windom has 12 MW of capacity from 5 generators. No full year of generation is reported yet.

Where is Windom?

Windom is in Cottonwood County, Minnesota, at about 43.868°, -95.114°. It is one of 7 power plants of 1 MW or more in the county.

Who operates Windom?

It is operated by City of Windom (MN) (EIA sector: Electric Utility), and it feeds MISO.

When did Windom open?

Its oldest generator still running came online in 2001.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Methodology.