Wind power plant · Winnebago, IA

Winnebago Wind Power Project

Winnebago Wind Power Project is a 20 MW wind power plant in Winnebago County, Iowa, operated by Avangrid Power LLC. Its oldest generator still running came online in 2008. In 2025 it generated 61 GWh, about what 5,900 average Iowa homes use in a year.

Capacity20 MWNameplate, September 2026
Generated61 GWhIn 2025
Capacity factor35%Share of the most it could make, 2025
Generators1Oldest from 2008

Winnebago Wind Power Project in context

Among the 123 wind plants in Iowa in the EIA's inventory, it is the 82nd largest, about 0.1% of the state's 13 GW of wind capacity.

Winnebago County has 7 power plants of 1 MW or more with 333 MW in all; Winnebago Wind Power Project is 6% of that and the 3rd largest of 3 wind plants there.

Its capacity factor of 35% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Winnebago County goes 4.5 hours a year without power, the 37th most of 98 counties in Iowa. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040608020182019202020212022202320242025GWh 61
020406080201920212023202561

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Winnebago Wind Power Project (outlined) and other plants in Winnebago County, shaded. 43.315, -93.770.

Plant facts

Operator
Avangrid Power LLC
Sector
IPP Non-CHP
Grid operator
MISO
County
Winnebago County, IA
EIA plant ID
56764
Where Iowa's power comes from → Iowa power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 20 MW 2008 –

Nearby

Other plants in Winnebago County

Questions

Winnebago Wind Power Project, answered

How much power does Winnebago Wind Power Project produce?

Winnebago Wind Power Project has 20 MW of capacity from one generator. In 2025 it generated 61 GWh, 35% of the most it could have made running flat out all year (its capacity factor).

How many homes does Winnebago Wind Power Project power?

Its 2025 output of 61 GWh equals the yearly electricity use of about 5,900 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Winnebago Wind Power Project?

Winnebago Wind Power Project is in Winnebago County, Iowa, at about 43.315°, -93.770°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Winnebago County goes 4.5 hours a year without power, the 37th most of 98 counties in Iowa. The county's page has the full outage record.

Who operates Winnebago Wind Power Project?

It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds MISO.

When did Winnebago Wind Power Project open?

Its oldest generator still running came online in 2008.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.