Storage power plant · Galveston, TX
Wizard Energy Storage
Wizard Energy Storage is a 150 MW storage power plant in Galveston County, Texas, operated by Wizard Energy Storage LLC. Its oldest generator still running came online in 2026.
Wizard Energy Storage in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 52nd largest, about 0.9% of the state's 16 GW of storage capacity.
Galveston County has 20 power plants of 1 MW or more with 3.2 GW in all; Wizard Energy Storage is 5% of that and the 3rd largest of 7 storage plants there.
The average electricity customer in Galveston County goes 23 hours a year without power, the 31st most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Wizard Energy Storage (outlined) and other plants in Galveston County, shaded. 29.499, -95.085.
Plant facts
- Operator
- Wizard Energy Storage LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Galveston County, TX
- EIA plant ID
- 69152
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WZRD | Batteries | 150 MW · 300 MWh | 2026 | – |
Questions
Wizard Energy Storage, answered
How much can Wizard Energy Storage store and deliver?
Wizard Energy Storage can deliver up to 150 MW and hold 300 MWh of energy, from one battery or storage system.
Where is Wizard Energy Storage?
Wizard Energy Storage is in Galveston County, Texas, at about 29.499°, -95.085°. It is one of 20 power plants of 1 MW or more in the county. The average electricity customer in Galveston County goes 23 hours a year without power, the 31st most of 240 counties in Texas. The county's page has the full outage record.
Who operates Wizard Energy Storage?
It is operated by Wizard Energy Storage LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Wizard Energy Storage open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.