Biomass power plant · Tyler, TX

Woodville Renewable Power Project

Woodville Renewable Power Project is a 50 MW biomass power plant in Tyler County, Texas, operated by East Texas Electric Coop, Inc. Its oldest generator still running came online in 2014.

Capacity50 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2014

Woodville Renewable Power Project in context

Among the 50 other-fuel plants in Texas in the EIA's inventory, it is the 9th largest, about 3.0% of the state's 1.6 GW of other-fuel capacity.

The average electricity customer in Tyler County goes 15 hours a year without power, the 78th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Woodville Renewable Power Project (outlined) and other plants in Tyler County, shaded. 30.748, -94.438.

Plant facts

Operator
East Texas Electric Coop, Inc
Sector
Electric Utility
Grid operator
MISO
County
Tyler County, TX
EIA plant ID
58944
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
G1 Wood/Wood Waste Biomass 50 MW 2014 –

Questions

Woodville Renewable Power Project, answered

How much power does Woodville Renewable Power Project produce?

Woodville Renewable Power Project has 50 MW of capacity from one generator. No full year of generation is reported yet.

Where is Woodville Renewable Power Project?

Woodville Renewable Power Project is in Tyler County, Texas, at about 30.748°, -94.438°. The average electricity customer in Tyler County goes 15 hours a year without power, the 78th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Woodville Renewable Power Project?

It is operated by East Texas Electric Coop, Inc (EIA sector: Electric Utility), and it feeds MISO.

When did Woodville Renewable Power Project open?

Its oldest generator still running came online in 2014.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.