Rooftop solar · 2025
Massachusetts
209,993 homes in Massachusetts had rooftop solar connected to the grid at the end of 2025: 7.2% of residential customers, 1.9× the US share of 3.8%. That ranks 7th of 51.
Growth
Solar installations, year by year
Net-metered solar installations at the end of each year, all customers and homes only. Massachusetts went from 89,946 in 2018 to 217,188 in 2025.
Capacity
Megawatts on rooftops
Net-metered solar capacity in MW. Utilities report it in AC or DC; EIA adds the two together.
Backup power
Batteries that keep the lights on
Net-metered batteries. Those paired with solar can keep a home running through an outage. Batteries without solar are reported separately from 2023.
Massachusetts among the states
- Share of homes with solar7.2%7th
- Solar installations217,1886th
- Net-metered capacity3.1 GW6th
- Growth in installations since 20182.4×39th
- Batteries per 10,000 homes1110th
Utility by utility
Solar on each utility's lines
Net-metered solar reported by each Massachusetts utility for 2025. Share of homes is residential installations over residential customers.
| Utility | Installations | Capacity | Share of homes | With battery |
|---|---|---|---|---|
| Massachusetts Electric Co | 117,217 | 1.5 GW | 9.3% | 112 |
| NSTAR Electric Company | 93,642 | 1.5 GW | 7.0% | 2,570 |
| Fitchburg Gas & Elec Light Co | 4,051 | 30 MW | 15.0% | 36 |
| City of Taunton | 539 | 11 MW | 1.4% | – |
| Town of Reading | 374 | 5.9 MW | 1.3% | 38 |
| Nantucket Electric Co | 355 | 4.7 MW | 2.4% | – |
| Town of Wellesley | 179 | 2.2 MW | 1.8% | – |
| Town of Shrewsbury | 179 | 1.6 MW | 1.1% | 12 |
| Town of Middleborough | 131 | 1.1 MW | 0.8% | – |
| Town of Littleton | 127 | 1.4 MW | 1.8% | – |
| Town of Danvers | 76 | 2.3 MW | 0.6% | – |
| City of Chicopee | 63 | 1.9 MW | 0.2% | 2 |
| Town of Mansfield | 55 | 2.2 MW | 0.5% | – |
| Town of North Attleborough | 53 | 1.9 MW | 0.4% | 6 |
| City of Peabody | 53 | 0.8 MW | 0.2% | – |
| Town of Braintree | 52 | 1.6 MW | 0.3% | 1 |
| City of Westfield | 27 | 0.6 MW | 0.1% | – |
| City of Holyoke | 15 | 0.1 MW | 0.1% | – |
Beyond net metering
Other generators on customers' sites
Generators of under 1 MW that Massachusetts utilities know about but do not net-meter, 2025.
Source: U.S. Energy Information Administration, Form EIA-861, net metering and non-net-metered distributed generation files, 2018–2025. State totals include EIA's estimates for small utilities that file the short form. Installations were counted as customers before 2021. How these numbers are built.