Wind turbines · Colorado
Wind farms in Colorado
3,320 turbines in 42 projects, about 5.4 GW of capacity, 1.6 GW of it built since 2020. Colorado ranks 7 of 45 states by wind capacity.
Largest
The biggest wind farms
| Project | County | Turbines | Capacity | Year |
|---|---|---|---|---|
| Cheyenne Ridge | Cheyenne County | 228 | 496 MW | 2020 |
| Peetz Table | Logan County | 267 | 414 MW | 2007 |
| Rush Creek I | Elbert County | 200 | 400 MW | 2018 |
| Cedar Creek | Weld County | 274 | 300 MW | 2007 |
| Bronco Plains | Kit Carson County | 108 | 299 MW | 2020 |
| Cedar Point | Lincoln County | 139 | 250 MW | 2011 |
| Cedar Creek II | Weld County | 122 | 248 MW | 2011 |
| Golden West Wind Farm | El Paso County | 145 | 246 MW | 2015 |
| Niyol Wind | Logan County | 74 | 206 MW | 2021 |
| Limon III | Lincoln County | 118 | 201 MW | 2014 |
| Limon I | Lincoln County | 125 | 200 MW | 2012 |
| Rush Creek II | Lincoln County | 100 | 200 MW | 2018 |
Build-out
Capacity added each year
How many wind turbines are in Colorado?
3,320 in the USGS US Wind Turbine Database (V9.1 release), in 42 projects with about 5.4 GW of capacity: the 7th most of any state by capacity.
What is the largest wind farm in Colorado?
Cheyenne Ridge in Cheyenne County, with 228 turbines and about 496 MW, online from 2020.
Which Colorado county has the most wind turbines?
Kit Carson County, with 753 turbines.
How tall are Colorado's wind turbines?
The tallest in the database reaches 180 meters to the blade tip (591 feet).
Source: US Geological Survey, Lawrence Berkeley National Laboratory and American Clean Power, US Wind Turbine Database (uswtdb_V9_1_20260928.csv), public domain. Capacity counts only turbines with a stated rating (5,056 of 77,839 nationwide have none), so totals are a floor.