Storage power plant · Plymouth, MA
59 Federal Rd(CSG)
59 Federal Rd(CSG) is a 10 MW storage power plant in Plymouth County, Massachusetts, operated by 59FED WHAM8 Solar, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 11 GWh, about what 1,600 average Massachusetts homes use in a year.
59 Federal Rd(CSG) in context
Among the 40 storage plants in Massachusetts in the EIA's inventory, it is the 6th largest, about 0.4% of the state's 2.4 GW of storage capacity.
Plymouth County has 69 power plants of 1 MW or more with 473 MW in all; 59 Federal Rd(CSG) is 2% of that and the 2nd largest of 7 storage plants there.
The average electricity customer in Plymouth County goes 11 hours a year without power, the 2nd most of 14 counties in Massachusetts. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
59 Federal Rd(CSG) (outlined) and other plants in Plymouth County, shaded. 41.828, -70.721.
Plant facts
- Operator
- 59FED WHAM8 Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ISNE
- County
- Plymouth County, MA
- EIA plant ID
- 64970
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 59FBA | Batteries | 5.0 MW · 21 MWh | 2021 | – |
| 59FPV | Solar Photovoltaic | 5.0 MW | 2021 | – |
Nearby
Other plants in Plymouth County
Questions
59 Federal Rd(CSG), answered
How much can 59 Federal Rd(CSG) store and deliver?
59 Federal Rd(CSG) can deliver up to 10 MW and hold 21 MWh of energy, from 2 storage units. Its net energy in 2025 was 11 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is 59 Federal Rd(CSG)?
59 Federal Rd(CSG) is in Plymouth County, Massachusetts, at about 41.828°, -70.721°. It is one of 69 power plants of 1 MW or more in the county. The average electricity customer in Plymouth County goes 11 hours a year without power, the 2nd most of 14 counties in Massachusetts. The county's page has the full outage record.
Who operates 59 Federal Rd(CSG)?
It is operated by 59FED WHAM8 Solar, LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.
When did 59 Federal Rd(CSG) open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Massachusetts home's 596 kWh a month in 2025. Methodology.