Storage power plant · Maricopa, AZ
AES ES GILBERT
AES ES GILBERT is a 10 MW storage power plant in Maricopa County, Arizona, operated by AES ES GILBERT, LLC. Its oldest generator still running came online in 2019.
AES ES GILBERT in context
Among the 41 storage plants in Arizona in the EIA's inventory, it is the 41st largest, about 0.2% of the state's 6.3 GW of storage capacity.
Maricopa County has 82 power plants of 1 MW or more with 24 GW in all; AES ES GILBERT is 0% of that and the 21st largest of 21 storage plants there.
The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
AES ES GILBERT (outlined) and other plants in Maricopa County, shaded. 33.447, -111.956.
Plant facts
- Operator
- AES ES GILBERT, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SRP
- County
- Maricopa County, AZ
- EIA plant ID
- 61861
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SRP | Batteries | 10 MW · 40 MWh | 2019 | – |
Questions
AES ES GILBERT, answered
How much can AES ES GILBERT store and deliver?
AES ES GILBERT can deliver up to 10 MW and hold 40 MWh of energy, from one battery or storage system.
Where is AES ES GILBERT?
AES ES GILBERT is in Maricopa County, Arizona, at about 33.447°, -111.956°. It is one of 82 power plants of 1 MW or more in the county. The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.
Who operates AES ES GILBERT?
It is operated by AES ES GILBERT, LLC (EIA sector: IPP Non-CHP), and it feeds Salt River Project.
When did AES ES GILBERT open?
Its oldest generator still running came online in 2019.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Methodology.