Solar power plant · Maricopa, AZ
Agave
Agave is a 150 MW solar power plant in Maricopa County, Arizona, operated by Arizona Public Service Co. Its oldest generator still running came online in 2023. In 2025 it generated 298 GWh, about what 24,000 average Arizona homes use in a year.
Agave in context
Among the 109 solar plants in Arizona in the EIA's inventory, it is the 24th largest, about 1.5% of the state's 9.9 GW of solar capacity.
Maricopa County has 82 power plants of 1 MW or more with 24 GW in all; Agave is 1% of that and the 12th largest of 40 solar plants there.
Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Agave (outlined) and other plants in Maricopa County, shaded. 33.324, -112.840.
Plant facts
- Operator
- Arizona Public Service Co
- Sector
- Electric Utility
- Grid operator
- AZPS
- County
- Maricopa County, AZ
- EIA plant ID
- 67964
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| A150M | Solar Photovoltaic | 150 MW | 2023 | – |
Planned
| Generator | Technology | Capacity | Expected |
|---|---|---|---|
| A400M | Batteries | 150 MW | 2026 |
Questions
Agave, answered
How much power does Agave produce?
Agave has 150 MW of capacity from one generator. In 2025 it generated 298 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Agave power?
Its 2025 output of 298 GWh equals the yearly electricity use of about 24,000 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Agave?
Agave is in Maricopa County, Arizona, at about 33.324°, -112.840°. It is one of 82 power plants of 1 MW or more in the county. The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Agave?
It is operated by Arizona Public Service Co (EIA sector: Electric Utility), and it feeds Arizona Public Service.
When did Agave open?
Its oldest generator still running came online in 2023. 1 more generator is planned.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.