Solar power plant · Los Angeles, CA

Antelope Expansion 3A

Antelope Expansion 3A is a 15 MW solar power plant in Los Angeles County, California, operated by AES Distributed Energy. Its oldest generator still running came online in 2021. In 2025 it generated 40 GWh, about what 6,800 average California homes use in a year.

Capacity15 MWNameplate, September 2026
Generated40 GWhIn 2025
Capacity factor31%Share of the most it could make, 2025
Generators1Oldest from 2021

Antelope Expansion 3A in context

Among the 967 solar plants in California in the EIA's inventory, it is the 271st largest, about 0.0% of the state's 32 GW of solar capacity.

Los Angeles County has 254 power plants of 1 MW or more with 14 GW in all; Antelope Expansion 3A is 0% of that and the 27th largest of 149 solar plants there.

Its capacity factor of 31% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Los Angeles County goes 4.5 hours a year without power, the 41st most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020406020212022202320242025GWh 40
02040602021202220232024202540

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Antelope Expansion 3A (outlined) and other plants in Los Angeles County, shaded. 34.729, -118.322.

Plant facts

Operator
AES Distributed Energy
Sector
IPP Non-CHP
Grid operator
CISO
County
Los Angeles County, CA
EIA plant ID
62673
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
ANX3A Solar Photovoltaic 15 MW 2021 –

Questions

Antelope Expansion 3A, answered

How much power does Antelope Expansion 3A produce?

Antelope Expansion 3A has 15 MW of capacity from one generator. In 2025 it generated 40 GWh, 31% of the most it could have made running flat out all year (its capacity factor).

How many homes does Antelope Expansion 3A power?

Its 2025 output of 40 GWh equals the yearly electricity use of about 6,800 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Antelope Expansion 3A?

Antelope Expansion 3A is in Los Angeles County, California, at about 34.729°, -118.322°. It is one of 254 power plants of 1 MW or more in the county. The average electricity customer in Los Angeles County goes 4.5 hours a year without power, the 41st most of 56 counties in California. The county's page has the full outage record.

Who operates Antelope Expansion 3A?

It is operated by AES Distributed Energy (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Antelope Expansion 3A open?

Its oldest generator still running came online in 2021.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.