Where the power comes from · 2025
California
Natural gas made 36% of the electricity generated in California in 2025, the 25th highest natural gas share of any state.
The mix
California's electricity by source
Share of utility-scale generation each year, 1990–2025. Hover a year for every source.
Every plant
California's power plants
1,936 plants with a generator of 1 MW or more, sized by capacity and colored by main source, as of September 2026. Click one to open it.
Capacity by source
Built and retired
What came online, what shut down
Nameplate capacity that entered service (above the line) and retired (below) in California, by year. 2026 runs through September 2026.
Carbon
CO₂ for every megawatt-hour
California's power plants emitted 185 kg of CO₂ for each MWh they generated in 2024, against 275 kg in 2005: the 7th lowest of 51. 40 million metric tons in all.
California among the states
- Generation205 TWh4th
- Renewable share55%9th
- Carbon-free share64%8th
- Cleanest electricity (kg CO₂/MWh, 2024)1857th
- Natural gas share36%25th
- Solar share27%2nd
- Hydro share14%10th
- Nuclear share8.6%26th
More on California
Power outage history → Rooftop solar and home batteries → Average electric bills →Plants
The largest plants in California
By nameplate capacity, with 2025 generation and capacity factor: generation over the most the plant could make running flat out all year.
| Plant | Source | County | Capacity | Generated | Capacity factor | Since |
|---|---|---|---|---|---|---|
| Diablo Canyon | Nuclear | San Luis Obispo | 2.3 GW | 18 TWh | 86% | 1985 |
| Dynegy Moss Landing Power Plant Hybrid | Natural gas | Monterey | 1.8 GW | 2.1 TWh | 13% | 2002 |
| Haynes | Natural gas | Los Angeles | 1.7 GW | 1.7 TWh | 11% | 1962 |
| Castaic | Storage | Los Angeles | 1.7 GW | 159 GWh | – | 1972 |
| Ormond Beach | Natural gas | Ventura | 1.6 GW | 19 GWh | 0% | 1971 |
| Geysers Unit 5-20 | Geothermal | Sonoma | 1.2 GW | 4.3 TWh | 40% | 1971 |
| La Paloma Generating Plant | Natural gas | Kern | 1.2 GW | 1.7 TWh | 17% | 2003 |
| AES Alamitos LLC | Natural gas | Los Angeles | 1.1 GW | 28 GWh | 0% | 1961 |
| Helms Pumped Storage | Storage | Fresno | 1.1 GW | -467.2 GWh | – | 1984 |
| Mountainview Generating Station | Natural gas | San Bernardino | 1.0 GW | 1.4 TWh | 15% | 2005 |
| Bellefield Solar and Energy Storage Farm | Solar | Kern | 1.0 GW | 58 GWh | – | 2025 |
| High Desert Power Plant | Natural gas | San Bernardino | 960 MW | 3.3 TWh | 40% | 2003 |
| Delta Energy Center | Natural gas | Contra Costa | 944 MW | 4.1 TWh | 50% | 2002 |
| Scattergood | Natural gas | Los Angeles | 876 MW | 1.7 TWh | 22% | 1958 |
| Marsh Landing Generating Station | Natural gas | Contra Costa | 828 MW | 16 GWh | 0% | 2013 |
| Sentinel Energy Center, LLC | Natural gas | Riverside | 800 MW | 140 GWh | 2% | 2013 |
| Pastoria Energy Facility, LLC | Natural gas | Kern | 779 MW | 3.6 TWh | 53% | 2005 |
| Shasta | Hydro | Shasta | 714 MW | 2.3 TWh | 38% | 1944 |
| Colusa Generating Station | Natural gas | Colusa | 712 MW | 2.6 TWh | 41% | 2010 |
| Otay Mesa Generating Project | Natural gas | San Diego | 711 MW | 1.6 TWh | 26% | 2009 |
| AES Huntington Beach Energy Project | Natural gas | Orange | 699 MW | 1.9 TWh | 31% | 2020 |
| Valley (CA) | Natural gas | Los Angeles | 691 MW | 1.0 TWh | 17% | 2001 |
| Sunrise Power LLC | Natural gas | Kern | 685 MW | 1.8 TWh | 30% | 2001 |
| Menifee Power Bank | Storage | Riverside | 680 MW | -117.5 GWh | – | 2024 |
| Los Medanos Energy Center | Natural gas | Contra Costa | 678 MW | 2.5 TWh | 42% | 2001 |
| AES Alamitos Energy Center | Natural gas | Los Angeles | 678 MW | 1.5 TWh | 25% | 2020 |
| Carlsbad Energy Center | Natural gas | San Diego | 659 MW | 216 GWh | 4% | 2018 |
| Russell City Energy Center | Natural gas | Alameda | 655 MW | 1.6 TWh | 27% | 2013 |
| Edward C Hyatt | Hydro | Butte | 644 MW | 2.0 TWh | 35% | 1968 |
| Sutter Energy Center | Natural gas | Sutter | 636 MW | 1.8 TWh | 32% | 2001 |
| Metcalf Energy Center | Natural gas | Santa Clara | 635 MW | 2.3 TWh | 42% | 2005 |
| Elk Hills Power LLC | Natural gas | Kern | 623 MW | 3.1 TWh | 57% | 2003 |
| Gateway Generating Station | Natural gas | Contra Costa | 620 MW | 2.9 TWh | 54% | 2009 |
| Blythe Energy Inc | Natural gas | Riverside | 591 MW | 315 GWh | 6% | 2003 |
| Topaz Solar Farm | Solar | San Luis Obispo | 586 MW | 1.0 TWh | 20% | 2013 |
| Palomar Energy | Natural gas | San Diego | 559 MW | 1.5 TWh | 30% | 2005 |
| Cosumnes Power Plant | Natural gas | Sacramento | 557 MW | 3.5 TWh | 73% | 2006 |
| Harbor | Natural gas | Los Angeles | 548 MW | 89 GWh | 2% | 1995 |
| Rexford Solar Farm | Solar | Tulare | 540 MW | 658 GWh | – | 2025 |
| El Segundo Energy Center LLC | Natural gas | Los Angeles | 537 MW | 45 GWh | 1% | 2013 |
| McCoy Solar Energy Project Hybrid | Solar | Riverside | 501 MW | 639 GWh | 15% | 2015 |
| Walnut Creek Energy Park | Natural gas | Los Angeles | 500 MW | 45 GWh | 1% | 2013 |
| Solar Blue | Solar | Kings | 475 MW | 652 GWh | 16% | 2023 |
| Eland Solar & Storage Center, Phase 1 Hy | Solar | Kern | 460 MW | 684 GWh | 17% | 2024 |
| Eland Solar & Storage Center, Phase 2 Hy | Solar | Kern | 458 MW | 260 GWh | – | 2025 |
| Desert Quartzite | Solar | Riverside | 450 MW | 823 GWh | 21% | 2024 |
| Daggett 3 | Solar | San Bernardino | 449 MW | 866 GWh | 22% | 2023 |
| Slate Hybrid | Solar | Kings | 440 MW | 727 GWh | 19% | 2021 |
| Panoche Energy Center | Natural gas | Fresno | 432 MW | 760 GWh | 20% | 2009 |
| W R Gianelli | Storage | Merced | 424 MW | -152.3 GWh | – | 1967 |
| Watson Cogeneration | Natural gas | Los Angeles | 405 MW | 2.3 TWh | 66% | 1987 |
| Kola Energy Center | Storage | San Joaquin | 400 MW | -26.2 GWh | – | 2025 |
| Arica Solar | Solar | Riverside | 399 MW | 777 GWh | 22% | 2024 |
| Pio Pico Energy Center | Natural gas | San Diego | 395 MW | 47 GWh | 1% | 2016 |
| El Centro Hybrid | Natural gas | Imperial | 388 MW | 1.1 TWh | 32% | 1952 |
| Magnolia Power Project | Natural gas | Los Angeles | 388 MW | 1.2 TWh | 36% | 2005 |
| Oberon Solar Project | Solar | Riverside | 375 MW | 582 GWh | 18% | 2023 |
| Oberon II Solar Project | Solar | Riverside | 375 MW | 590 GWh | 18% | 2023 |
| Arlington Energy Center II | Solar | Riverside | 365 MW | 634 GWh | 20% | 2022 |
| Proxima | Solar | Stanislaus | 352 MW | 464 GWh | 15% | 2024 |
| Crimson | Storage | Riverside | 350 MW | -66.0 GWh | – | 2022 |
| Scarlet II Hybrid | Solar | Fresno | 350 MW | 385 GWh | 13% | 2024 |
| Easley Solar | Storage | Riverside | 350 MW | – | – | 2026 |
| Golden Field Solar III, LLC | Solar | Kern | 339 MW | 521 GWh | 18% | 2020 |
| Tracy Combined Cycle Power Plant | Natural gas | San Joaquin | 336 MW | 896 GWh | 30% | 2003 |
| Blythe Mesa Solar II | Solar | Riverside | 336 MW | 586 GWh | 20% | 2022 |
| Desert Peak Energy Storage I | Storage | Riverside | 325 MW | -63.1 GWh | – | 2023 |
| Solar Star 1 | Solar | Kern | 318 MW | 897 GWh | 32% | 2014 |
| Colgate | Hydro | Yuba | 315 MW | 1.3 TWh | 46% | 1969 |
| Desert Sunlight 300, LLC | Solar | Riverside | 314 MW | 620 GWh | 23% | 2013 |
| Daggett 2 | Solar | San Bernardino | 313 MW | 519 GWh | 19% | 2023 |
| Los Esteros Critical Energy Center | Natural gas | Santa Clara | 306 MW | 157 GWh | 6% | 2003 |
| Walnut Energy Center | Natural gas | Stanislaus | 301 MW | 1.6 TWh | 61% | 2006 |
| Solano Wind | Wind | Solano | 301 MW | 770 GWh | 29% | 2006 |
| New Melones | Hydro | Tuolumne | 300 MW | 271 GWh | 10% | 1979 |
| Kern River Cogeneration | Natural gas | Kern | 300 MW | 112 GWh | 4% | 1985 |
| Sycamore Cogeneration | Natural gas | Kern | 300 MW | 197 GWh | 8% | 1987 |
| Nighthawk Energy Storage, LLC | Storage | San Diego | 300 MW | – | – | 2026 |
| Stateline Solar | Solar | San Bernardino | 300 MW | 640 GWh | 24% | 2015 |
| Edwards Sanborn E1A | Solar | Kern | 293 MW | 332 GWh | 13% | 2022 |
| Edwards Sanborn E1B | Solar | Kern | 290 MW | 355 GWh | 14% | 2022 |
| Lodi Energy Center | Natural gas | San Joaquin | 289 MW | 580 GWh | 23% | 2012 |
| Fifth Standard Solar PV, LLC (Hybrid) | Solar | Fresno | 287 MW | 301 GWh | 12% | 2023 |
| Vikings Energy Farm | Storage | Imperial | 287 MW | 315 GWh | – | 2024 |
| Chestnut | Solar | Kings | 286 MW | 378 GWh | 15% | 2023 |
| Mojave Solar Project | Solar | San Bernardino | 280 MW | 590 GWh | 24% | 2014 |
| Solar Star 2 | Solar | Kern | 279 MW | 721 GWh | 30% | 2014 |
| RE Tranquillity | Solar | Fresno | 277 MW | 485 GWh | 20% | 2016 |
| Devil Canyon | Hydro | San Bernardino | 276 MW | 790 GWh | 33% | 1972 |
| RE Garland | Solar | Kern | 273 MW | 510 GWh | 21% | 2016 |
| White Rock/Slab Creek | Hydro | El Dorado | 269 MW | 449 GWh | 19% | 1968 |
| Glenarm | Natural gas | Los Angeles | 266 MW | 130 GWh | 6% | 1976 |
| Ocotillo Express LLC | Wind | Imperial | 265 MW | 435 GWh | 19% | 2012 |
| Chaparral Springs | Solar | Kern | 262 MW | 413 GWh | – | 2025 |
| Edwards Sanborn E2 | Solar | Kern | 258 MW | 301 GWh | 13% | 2021 |
| Rosamond South 1 | Solar | Kern | 257 MW | 157 GWh | – | 2025 |
| Collierville Powerhouse | Hydro | Calaveras | 253 MW | 342 GWh | 15% | 1989 |
| AV Solar Ranch One | Solar | Los Angeles | 253 MW | 565 GWh | 26% | 2014 |
| Mount Signal Solar Farm V | Solar | Imperial | 252 MW | 674 GWh | 31% | 2018 |
| Long Beach Generation | Natural gas | Los Angeles | 252 MW | 5.9 GWh | 0% | 1976 |
Coming next
Planned projects
The largest generators reported as planned in California, by expected year. Plans change; some will be delayed or cancelled.
| Project | Source | County | Capacity | Expected |
|---|---|---|---|---|
| Bellefield 2 Solar & Energy Storage Farm | Solar | Kern | 500 MW | 2026 |
| Bellefield 2 Solar & Energy Storage Farm | Storage | Kern | 500 MW | 2026 |
| Grace Energy Center | Solar | Riverside | 500 MW | 2027 |
| Grace Energy Center | Storage | Riverside | 500 MW | 2027 |
| Pelicans Jaw Hybrid Solar | Solar | Kern | 440 MW | 2027 |
| Gabriel | Storage | Los Angeles | 400 MW | 2027 |
| Marici | Storage | Los Angeles | 400 MW | 2027 |
| Lycan Solar Project | Solar | Riverside | 400 MW | 2027 |
| Lycan Solar Project | Storage | Riverside | 400 MW | 2030 |
| Country Acres Clean Power LLC | Solar | Placer | 344 MW | 2027 |
| Darden I Solar | Solar | Fresno | 343 MW | 2028 |
| Darden II Solar | Solar | Fresno | 343 MW | 2028 |
| Darden III Solar | Solar | Fresno | 343 MW | 2028 |
| Darden IV Solar | Solar | Fresno | 343 MW | 2028 |
| Darden I Solar | Storage | Fresno | 304 MW | 2028 |
| Darden II Solar | Storage | Fresno | 304 MW | 2028 |
| Darden III Solar | Storage | Fresno | 304 MW | 2028 |
| Darden IV Solar | Storage | Fresno | 304 MW | 2028 |
| Easley Solar | Storage | Riverside | 300 MW | 2028 |
| Roadhouse Energy Center | Storage | San Bernardino | 300 MW | 2027 |
| Humidor Storage I | Storage | Los Angeles | 300 MW | 2029 |
| Easley Solar | Solar | Riverside | 290 MW | 2026 |
| Cobalt | Solar | Riverside | 250 MW | 2027 |
| Athens Solar I (Hybrid) | Solar | Placer | 250 MW | 2028 |
| Athens Solar I (Hybrid) | Storage | Placer | 250 MW | 2028 |
| Haiwee Pumped Storage Project | Storage | Inyo | 250 MW | 2028 |
| Haiwee Pumped Storage Project | Storage | Inyo | 250 MW | 2028 |
| Haiwee Pumped Storage Project | Storage | Inyo | 250 MW | 2028 |
| Haiwee Pumped Storage Project | Storage | Inyo | 250 MW | 2028 |
| Cherry | Solar | Kings | 250 MW | 2027 |
Shut down
Retired since 2010
The largest generators retired in California since 2010.
| Plant | Source | Capacity | Retired |
|---|---|---|---|
| San Onofre Nuclear Generating Station | Nuclear | 1.1 GW | 2013 |
| San Onofre Nuclear Generating Station | Nuclear | 1.1 GW | 2013 |
| Pittsburg Power | Natural gas | 751 MW | 2017 |
| Dynegy Moss Landing Power Plant Hybrid | Natural gas | 702 MW | 2016 |
| Dynegy Moss Landing Power Plant Hybrid | Natural gas | 702 MW | 2016 |
| Scattergood | Natural gas | 497 MW | 2015 |
| AES Alamitos LLC | Natural gas | 495 MW | 2019 |
| AES Redondo Beach LLC | Natural gas | 495 MW | 2023 |
| AES Redondo Beach LLC | Natural gas | 495 MW | 2019 |
| Inland Empire Energy Center | Natural gas | 410 MW | 2020 |
| Inland Empire Energy Center | Natural gas | 410 MW | 2020 |
| Dynegy Morro Bay LLC | Natural gas | 359 MW | 2014 |
| Dynegy Morro Bay LLC | Natural gas | 359 MW | 2014 |
| Contra Costa | Natural gas | 359 MW | 2013 |
| Contra Costa | Natural gas | 359 MW | 2013 |
| Encina | Natural gas | 346 MW | 2018 |
| Haynes | Natural gas | 343 MW | 2013 |
| Haynes | Natural gas | 343 MW | 2013 |
| El Segundo Power | Natural gas | 342 MW | 2015 |
| El Segundo Power | Natural gas | 342 MW | 2013 |
| Etiwanda Generating Station | Natural gas | 333 MW | 2018 |
| Etiwanda Generating Station | Natural gas | 333 MW | 2018 |
| Altamont Pass Windplant | Wind | 333 MW | 2015 |
| Pittsburg Power | Natural gas | 326 MW | 2017 |
| Pittsburg Power | Natural gas | 326 MW | 2017 |
| Encina | Natural gas | 306 MW | 2018 |
| Dynegy Moss Landing Power Plant Hybrid | Storage | 300 MW | 2025 |
| AES Huntington Beach LLC | Natural gas | 227 MW | 2012 |
| Potrero Power | Natural gas | 226 MW | 2011 |
| AES Huntington Beach LLC | Natural gas | 225 MW | 2012 |
Sources: U.S. Energy Information Administration: state historical generation tables (1990–2025), Form EIA-860M generator inventory (September 2026) and Form EIA-923 plant generation. Shares leave out pumped storage. Rooftop solar is not included. Methodology.