Solar power plant · Kern, CA

Hecate Energy Beacon Solar 3

Hecate Energy Beacon Solar 3 is a 56 MW solar power plant in Kern County, California, operated by AES Distributed Energy. Its oldest generator still running came online in 2016. In 2025 it generated 122 GWh, about what 21,000 average California homes use in a year.

Capacity56 MWNameplate, September 2026
Generated122 GWhIn 2025
Capacity factor25%Share of the most it could make, 2025
Generators1Oldest from 2016

Hecate Energy Beacon Solar 3 in context

Among the 967 solar plants in California in the EIA's inventory, it is the 128th largest, about 0.2% of the state's 32 GW of solar capacity.

Kern County has 268 power plants of 1 MW or more with 19 GW in all; Hecate Energy Beacon Solar 3 is 0% of that and the 39th largest of 158 solar plants there.

Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020020182019202020212022202320242025GWh 122
0501001502002019202120232025122

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Hecate Energy Beacon Solar 3 (outlined) and other plants in Kern County, shaded. 35.253, -118.015.

Plant facts

Operator
AES Distributed Energy
Sector
IPP Non-CHP
Grid operator
LDWP
County
Kern County, CA
EIA plant ID
59316
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BEAC3 Solar Photovoltaic 56 MW 2016 –

Questions

Hecate Energy Beacon Solar 3, answered

How much power does Hecate Energy Beacon Solar 3 produce?

Hecate Energy Beacon Solar 3 has 56 MW of capacity from one generator. In 2025 it generated 122 GWh, 25% of the most it could have made running flat out all year (its capacity factor).

How many homes does Hecate Energy Beacon Solar 3 power?

Its 2025 output of 122 GWh equals the yearly electricity use of about 21,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Hecate Energy Beacon Solar 3?

Hecate Energy Beacon Solar 3 is in Kern County, California, at about 35.253°, -118.015°. It is one of 268 power plants of 1 MW or more in the county. The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.

Who operates Hecate Energy Beacon Solar 3?

It is operated by AES Distributed Energy (EIA sector: IPP Non-CHP), and it feeds the Los Angeles Department of Water and Power.

When did Hecate Energy Beacon Solar 3 open?

Its oldest generator still running came online in 2016.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.