Solar power plant · Kern, CA
Eland Solar & Storage Center, Phase 1 Hy
Eland Solar & Storage Center, Phase 1 Hy is a 460 MW solar power plant in Kern County, California, operated by 68SF 8me LLC. Its oldest generator still running came online in 2024. In 2025 it generated 684 GWh, about what 115,000 average California homes use in a year.
Eland Solar & Storage Center, Phase 1 Hy in context
Among the 967 solar plants in California in the EIA's inventory, it is the 6th largest, about 1.5% of the state's 32 GW of solar capacity.
Kern County has 268 power plants of 1 MW or more with 19 GW in all; Eland Solar & Storage Center, Phase 1 Hy is 2% of that and the 2nd largest of 158 solar plants there.
Its capacity factor of 17% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Eland Solar & Storage Center, Phase 1 Hy (outlined) and other plants in Kern County, shaded. 35.224, -117.977.
Plant facts
- Operator
- 68SF 8me LLC
- Sector
- IPP Non-CHP
- Grid operator
- LDWP
- County
- Kern County, CA
- EIA plant ID
- 61168
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 68SF8 | Solar Photovoltaic | 310 MW | 2024 | – |
| 61168 | Batteries | 150 MW · 600 MWh | 2024 | – |
Nearby
Other plants in Kern County
Questions
Eland Solar & Storage Center, Phase 1 Hy, answered
How much power does Eland Solar & Storage Center, Phase 1 Hy produce?
Eland Solar & Storage Center, Phase 1 Hy has 460 MW of capacity from 2 generators. In 2025 it generated 684 GWh, 17% of the most it could have made running flat out all year (its capacity factor).
How many homes does Eland Solar & Storage Center, Phase 1 Hy power?
Its 2025 output of 684 GWh equals the yearly electricity use of about 115,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Eland Solar & Storage Center, Phase 1 Hy?
Eland Solar & Storage Center, Phase 1 Hy is in Kern County, California, at about 35.224°, -117.977°. It is one of 268 power plants of 1 MW or more in the county. The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.
Who operates Eland Solar & Storage Center, Phase 1 Hy?
It is operated by 68SF 8me LLC (EIA sector: IPP Non-CHP), and it feeds the Los Angeles Department of Water and Power.
When did Eland Solar & Storage Center, Phase 1 Hy open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.