Solar power plant · Kern, CA

Eland Solar & Storage Center, Phase 2 Hy

Eland Solar & Storage Center, Phase 2 Hy is a 458 MW solar power plant in Kern County, California, operated by 69SV 8me LLC. Its oldest generator still running came online in 2025. In 2025 it generated 260 GWh, about what 44,000 average California homes use in a year.

Capacity458 MWNameplate, September 2026
Generated260 GWhIn 2025
Capacity factor–Not a full year of data
Generators2Oldest from 2025

Eland Solar & Storage Center, Phase 2 Hy in context

Among the 967 solar plants in California in the EIA's inventory, it is the 7th largest, about 1.5% of the state's 32 GW of solar capacity.

Kern County has 268 power plants of 1 MW or more with 19 GW in all; Eland Solar & Storage Center, Phase 2 Hy is 2% of that and the 3rd largest of 158 solar plants there.

The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Eland Solar & Storage Center, Phase 2 Hy (outlined) and other plants in Kern County, shaded. 35.217, -117.977.

Plant facts

Operator
69SV 8me LLC
Sector
IPP Non-CHP
Grid operator
LDWP
County
Kern County, CA
EIA plant ID
61169
  • Solar308 MW67%
  • Storage150 MW33%
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
69SV8 Solar Photovoltaic 308 MW 2025 –
61169 Batteries 150 MW · 600 MWh 2025 –

Questions

Eland Solar & Storage Center, Phase 2 Hy, answered

How much power does Eland Solar & Storage Center, Phase 2 Hy produce?

Eland Solar & Storage Center, Phase 2 Hy has 458 MW of capacity from 2 generators. In 2025 it generated 260 GWh.

How many homes does Eland Solar & Storage Center, Phase 2 Hy power?

Its 2025 output of 260 GWh equals the yearly electricity use of about 44,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Eland Solar & Storage Center, Phase 2 Hy?

Eland Solar & Storage Center, Phase 2 Hy is in Kern County, California, at about 35.217°, -117.977°. It is one of 268 power plants of 1 MW or more in the county. The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.

Who operates Eland Solar & Storage Center, Phase 2 Hy?

It is operated by 69SV 8me LLC (EIA sector: IPP Non-CHP), and it feeds the Los Angeles Department of Water and Power.

When did Eland Solar & Storage Center, Phase 2 Hy open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.