Solar power plant · Stanislaus, CA
Proxima
Proxima is a 352 MW solar power plant in Stanislaus County, California, operated by Proxima Solar, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 464 GWh, about what 78,000 average California homes use in a year.
Proxima in context
Among the 967 solar plants in California in the EIA's inventory, it is the 15th largest, about 1.1% of the state's 32 GW of solar capacity.
Stanislaus County has 20 power plants of 1 MW or more with 1.5 GW in all; Proxima is 23% of that and the largest of 7 solar plants there.
Its capacity factor of 15% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Stanislaus County goes 0.4 hours a year without power, the 56th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Proxima (outlined) and other plants in Stanislaus County, shaded. 37.400, -121.163.
Plant facts
- Operator
- Proxima Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Stanislaus County, CA
- EIA plant ID
- 66270
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PRXMA | Solar Photovoltaic | 190 MW | 2024 | – |
| PRXBS | Batteries | 162 MW · 648 MWh | 2024 | – |
Questions
Proxima, answered
How much power does Proxima produce?
Proxima has 352 MW of capacity from 2 generators. In 2025 it generated 464 GWh, 15% of the most it could have made running flat out all year (its capacity factor).
How many homes does Proxima power?
Its 2025 output of 464 GWh equals the yearly electricity use of about 78,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Proxima?
Proxima is in Stanislaus County, California, at about 37.400°, -121.163°. It is one of 20 power plants of 1 MW or more in the county. The average electricity customer in Stanislaus County goes 0.4 hours a year without power, the 56th most of 56 counties in California. The county's page has the full outage record.
Who operates Proxima?
It is operated by Proxima Solar, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Proxima open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.