Solar power plant · Sacramento, CA

Rancho Seco Solar II, LLC

Rancho Seco Solar II, LLC is a 160 MW solar power plant in Sacramento County, California, operated by Rancho Seco Solar II, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 275 GWh, about what 46,000 average California homes use in a year.

Capacity160 MWNameplate, September 2026
Generated275 GWhIn 2025
Capacity factor20%Share of the most it could make, 2025
Generators1Oldest from 2021

Rancho Seco Solar II, LLC in context

Among the 967 solar plants in California in the EIA's inventory, it is the 67th largest, about 0.5% of the state's 32 GW of solar capacity.

Sacramento County has 63 power plants of 1 MW or more with 1.8 GW in all; Rancho Seco Solar II, LLC is 9% of that and the largest of 53 solar plants there.

Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Sacramento County goes 3.9 hours a year without power, the 46th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040020212022202320242025GWh 275
010020030040020212022202320242025275

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Rancho Seco Solar II, LLC (outlined) and other plants in Sacramento County, shaded. 38.347, -121.120.

Plant facts

Operator
Rancho Seco Solar II, LLC
Sector
IPP Non-CHP
Grid operator
BANC
County
Sacramento County, CA
EIA plant ID
63387
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
RSS2 Solar Photovoltaic 160 MW 2021 –

Questions

Rancho Seco Solar II, LLC, answered

How much power does Rancho Seco Solar II, LLC produce?

Rancho Seco Solar II, LLC has 160 MW of capacity from one generator. In 2025 it generated 275 GWh, 20% of the most it could have made running flat out all year (its capacity factor).

How many homes does Rancho Seco Solar II, LLC power?

Its 2025 output of 275 GWh equals the yearly electricity use of about 46,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Rancho Seco Solar II, LLC?

Rancho Seco Solar II, LLC is in Sacramento County, California, at about 38.347°, -121.120°. It is one of 63 power plants of 1 MW or more in the county. The average electricity customer in Sacramento County goes 3.9 hours a year without power, the 46th most of 56 counties in California. The county's page has the full outage record.

Who operates Rancho Seco Solar II, LLC?

It is operated by Rancho Seco Solar II, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority BANC.

When did Rancho Seco Solar II, LLC open?

Its oldest generator still running came online in 2021.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.