Hydro power plant · Sacramento, CA
Folsom
Folsom is a 199 MW hydro power plant in Sacramento County, California, operated by U S Bureau of Reclamation. Its oldest generator still running came online in 1955. In 2025 it generated 503 GWh, about what 85,000 average California homes use in a year.
Folsom in context
Among the 238 hydro plants in California in the EIA's inventory, it is the 8th largest, about 1.9% of the state's 10 GW of hydro capacity.
Sacramento County has 63 power plants of 1 MW or more with 1.8 GW in all; Folsom is 11% of that and the largest of 2 hydro plants there.
Its capacity factor of 29% in 2025 is lower than the 34% typical for hydro plants across the US.
The average electricity customer in Sacramento County goes 3.9 hours a year without power, the 46th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Folsom (outlined) and other plants in Sacramento County, shaded. 38.707, -121.158.
Plant facts
- Operator
- U S Bureau of Reclamation
- Sector
- Electric Utility
- Grid operator
- BANC
- County
- Sacramento County, CA
- EIA plant ID
- 441
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 66 MW | 1955 | – |
| 2 | Conventional Hydroelectric | 66 MW | 1955 | – |
| 3 | Conventional Hydroelectric | 66 MW | 1955 | – |
Questions
Folsom, answered
How much power does Folsom produce?
Folsom has 199 MW of capacity from 3 generators. In 2025 it generated 503 GWh, 29% of the most it could have made running flat out all year (its capacity factor).
How many homes does Folsom power?
Its 2025 output of 503 GWh equals the yearly electricity use of about 85,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Folsom?
Folsom is in Sacramento County, California, at about 38.707°, -121.158°. It is one of 63 power plants of 1 MW or more in the county. The average electricity customer in Sacramento County goes 3.9 hours a year without power, the 46th most of 56 counties in California. The county's page has the full outage record.
Who operates Folsom?
It is operated by U S Bureau of Reclamation (EIA sector: Electric Utility), and it feeds balancing authority BANC.
When did Folsom open?
Its oldest generator still running came online in 1955.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.