Storage power plant · Fresno, CA

Acid BESS

Acid BESS is a 97 MW storage power plant in Fresno County, California, operated by Malaga BESS LLC. Its oldest generator still running came online in 2025.

Capacity97 MWNameplate, September 2026
Net energy-3.4 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Acid BESS in context

Among the 156 storage plants in California in the EIA's inventory, it is the 44th largest, about 0.7% of the state's 13 GW of storage capacity.

Fresno County has 105 power plants of 1 MW or more with 5.9 GW in all; Acid BESS is 2% of that and the 3rd largest of 3 storage plants there.

The average electricity customer in Fresno County goes 3.5 hours a year without power, the 48th most of 56 counties in California. The county's page has the full outage record.

Where it is

Acid BESS (outlined) and other plants in Fresno County, shaded. 36.691, -119.740.

Plant facts

Operator
Malaga BESS LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Fresno County, CA
EIA plant ID
66659
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
MAL Batteries 97 MW · 97 MWh 2025 –

Questions

Acid BESS, answered

How much can Acid BESS store and deliver?

Acid BESS can deliver up to 97 MW and hold 97 MWh of energy, from one battery or storage system. Its net energy in 2025 was -3.4 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Acid BESS?

Acid BESS is in Fresno County, California, at about 36.691°, -119.740°. It is one of 105 power plants of 1 MW or more in the county. The average electricity customer in Fresno County goes 3.5 hours a year without power, the 48th most of 56 counties in California. The county's page has the full outage record.

Who operates Acid BESS?

It is operated by Malaga BESS LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Acid BESS open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.