Solar power plant · Fresno, CA
Scarlet II Hybrid
Scarlet II Hybrid is a 350 MW solar power plant in Fresno County, California, operated by EDPR Scarlet II LLC. Its oldest generator still running came online in 2024. In 2025 it generated 385 GWh, about what 65,000 average California homes use in a year.
Scarlet II Hybrid in context
Among the 967 solar plants in California in the EIA's inventory, it is the 16th largest, about 1.1% of the state's 32 GW of solar capacity.
Fresno County has 105 power plants of 1 MW or more with 5.9 GW in all; Scarlet II Hybrid is 6% of that and the largest of 73 solar plants there.
Its capacity factor of 13% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Fresno County goes 3.5 hours a year without power, the 48th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Scarlet II Hybrid (outlined) and other plants in Fresno County, shaded. 36.604, -120.376.
Plant facts
- Operator
- EDPR Scarlet II LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Fresno County, CA
- EIA plant ID
- 66951
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN03 | Solar Photovoltaic | 200 MW | 2024 | – |
| GEN04 | Batteries | 150 MW · 600 MWh | 2024 | – |
Questions
Scarlet II Hybrid, answered
How much power does Scarlet II Hybrid produce?
Scarlet II Hybrid has 350 MW of capacity from 2 generators. In 2025 it generated 385 GWh, 13% of the most it could have made running flat out all year (its capacity factor).
How many homes does Scarlet II Hybrid power?
Its 2025 output of 385 GWh equals the yearly electricity use of about 65,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Scarlet II Hybrid?
Scarlet II Hybrid is in Fresno County, California, at about 36.604°, -120.376°. It is one of 105 power plants of 1 MW or more in the county. The average electricity customer in Fresno County goes 3.5 hours a year without power, the 48th most of 56 counties in California. The county's page has the full outage record.
Who operates Scarlet II Hybrid?
It is operated by EDPR Scarlet II LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Scarlet II Hybrid open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.