Solar power plant · Fresno, CA
Fifth Standard Solar PV, LLC (Hybrid)
Fifth Standard Solar PV, LLC (Hybrid) is a 287 MW solar power plant in Fresno County, California, operated by RWE Americas, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 301 GWh, about what 51,000 average California homes use in a year.
Fifth Standard Solar PV, LLC (Hybrid) in context
Among the 967 solar plants in California in the EIA's inventory, it is the 25th largest, about 0.9% of the state's 32 GW of solar capacity.
Fresno County has 105 power plants of 1 MW or more with 5.9 GW in all; Fifth Standard Solar PV, LLC (Hybrid) is 5% of that and the 2nd largest of 73 solar plants there.
Its capacity factor of 12% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Fresno County goes 3.5 hours a year without power, the 48th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Fifth Standard Solar PV, LLC (Hybrid) (outlined) and other plants in Fresno County, shaded. 36.153, -120.105.
Plant facts
- Operator
- RWE Americas, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Fresno County, CA
- EIA plant ID
- 64197
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| FTHSS | Solar Photovoltaic | 150 MW | 2023 | – |
| FTHSB | Batteries | 137 MW · 137 MWh | 2023 | – |
Questions
Fifth Standard Solar PV, LLC (Hybrid), answered
How much power does Fifth Standard Solar PV, LLC (Hybrid) produce?
Fifth Standard Solar PV, LLC (Hybrid) has 287 MW of capacity from 2 generators. In 2025 it generated 301 GWh, 12% of the most it could have made running flat out all year (its capacity factor).
How many homes does Fifth Standard Solar PV, LLC (Hybrid) power?
Its 2025 output of 301 GWh equals the yearly electricity use of about 51,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Fifth Standard Solar PV, LLC (Hybrid)?
Fifth Standard Solar PV, LLC (Hybrid) is in Fresno County, California, at about 36.153°, -120.105°. It is one of 105 power plants of 1 MW or more in the county. The average electricity customer in Fresno County goes 3.5 hours a year without power, the 48th most of 56 counties in California. The county's page has the full outage record.
Who operates Fifth Standard Solar PV, LLC (Hybrid)?
It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Fifth Standard Solar PV, LLC (Hybrid) open?
Its oldest generator still running came online in 2023.