Natural gas power plant · San Diego, CA

Chula Vista Energy Center

Chula Vista Energy Center is a 37 MW natural gas power plant in San Diego County, California, operated by Wellhead Services, Inc. Its oldest generator still running came online in 2001. In 2025 it generated 0.4 GWh, about what 67 average California homes use in a year.

Capacity37 MWNameplate, September 2026
Generated0.4 GWhIn 2025
Capacity factor0%Share of the most it could make, 2025
Generators1Oldest from 2001

Chula Vista Energy Center in context

Among the 304 natural gas plants in California in the EIA's inventory, it is the 157th largest, about 0.1% of the state's 41 GW of natural gas capacity.

San Diego County has 107 power plants of 1 MW or more with 5.1 GW in all; Chula Vista Energy Center is 1% of that and the 14th largest of 29 natural gas plants there.

Its capacity factor of 0% in 2025 is lower than the 23% typical for natural gas plants across the US.

The average electricity customer in San Diego County goes 3.3 hours a year without power, the 49th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

024620182019202020212022202320242025GWh 0
024620192021202320250

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Chula Vista Energy Center (outlined) and other plants in San Diego County, shaded. 32.592, -117.059.

Plant facts

Operator
Wellhead Services, Inc
Sector
IPP Non-CHP
Grid operator
CISO
County
San Diego County, CA
EIA plant ID
55540
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN1 Natural Gas Fired Combustion Turbine 37 MW 2001 –

Questions

Chula Vista Energy Center, answered

How much power does Chula Vista Energy Center produce?

Chula Vista Energy Center has 37 MW of capacity from one generator. In 2025 it generated 0.4 GWh, 0% of the most it could have made running flat out all year (its capacity factor).

How many homes does Chula Vista Energy Center power?

Its 2025 output of 0.4 GWh equals the yearly electricity use of about 67 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Chula Vista Energy Center?

Chula Vista Energy Center is in San Diego County, California, at about 32.592°, -117.059°. It is one of 107 power plants of 1 MW or more in the county. The average electricity customer in San Diego County goes 3.3 hours a year without power, the 49th most of 56 counties in California. The county's page has the full outage record.

Who operates Chula Vista Energy Center?

It is operated by Wellhead Services, Inc (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Chula Vista Energy Center open?

Its oldest generator still running came online in 2001.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.