Natural gas power plant · San Diego, CA

Otay Mesa Generating Project

Otay Mesa Generating Project is a 711 MW natural gas power plant in San Diego County, California, operated by Otay Mesa Energy Center LLC. Its oldest generator still running came online in 2009. In 2025 it generated 1.6 TWh, about what 275,000 average California homes use in a year.

Capacity711 MWNameplate, September 2026
Generated1.6 TWhIn 2025
Capacity factor26%Share of the most it could make, 2025
Generators3Oldest from 2009

Otay Mesa Generating Project in context

Among the 304 natural gas plants in California in the EIA's inventory, it is the 14th largest, about 1.7% of the state's 41 GW of natural gas capacity.

San Diego County has 107 power plants of 1 MW or more with 5.1 GW in all; Otay Mesa Generating Project is 14% of that and the largest of 29 natural gas plants there.

Its capacity factor of 26% in 2025 is higher than the 23% typical for natural gas plants across the US.

The average electricity customer in San Diego County goes 3.3 hours a year without power, the 49th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01,0002,0003,00020182019202020212022202320242025GWh 1,630
01,0002,0003,00020192021202320251,630

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Otay Mesa Generating Project (outlined) and other plants in San Diego County, shaded. 32.581, -116.915.

Plant facts

Operator
Otay Mesa Energy Center LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
San Diego County, CA
EIA plant ID
55345
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1-03 Natural Gas Fired Combined Cycle 291 MW 2009 –
1-01 Natural Gas Fired Combined Cycle 210 MW 2009 –
1-02 Natural Gas Fired Combined Cycle 210 MW 2009 –

Questions

Otay Mesa Generating Project, answered

How much power does Otay Mesa Generating Project produce?

Otay Mesa Generating Project has 711 MW of capacity from 3 generators. In 2025 it generated 1.6 TWh, 26% of the most it could have made running flat out all year (its capacity factor).

How many homes does Otay Mesa Generating Project power?

Its 2025 output of 1.6 TWh equals the yearly electricity use of about 275,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Otay Mesa Generating Project?

Otay Mesa Generating Project is in San Diego County, California, at about 32.581°, -116.915°. It is one of 107 power plants of 1 MW or more in the county. The average electricity customer in San Diego County goes 3.3 hours a year without power, the 49th most of 56 counties in California. The county's page has the full outage record.

Who operates Otay Mesa Generating Project?

It is operated by Otay Mesa Energy Center LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Otay Mesa Generating Project open?

Its oldest generator still running came online in 2009.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.