Storage power plant · Los Angeles, CA
Cathode (Hinson) BESS
Cathode (Hinson) BESS is a 200 MW storage power plant in Los Angeles County, California, operated by Southern California Edison Co. Its oldest generator still running came online in 2024.
Cathode (Hinson) BESS in context
Among the 156 storage plants in California in the EIA's inventory, it is the 16th largest, about 1.5% of the state's 13 GW of storage capacity.
Los Angeles County has 254 power plants of 1 MW or more with 14 GW in all; Cathode (Hinson) BESS is 1% of that and the 2nd largest of 17 storage plants there.
The average electricity customer in Los Angeles County goes 4.5 hours a year without power, the 41st most of 56 counties in California. The county's page has the full outage record.
Where it is
Cathode (Hinson) BESS (outlined) and other plants in Los Angeles County, shaded. 33.776, -118.200.
Plant facts
- Operator
- Southern California Edison Co
- Sector
- Electric Utility
- Grid operator
- CISO
- County
- Los Angeles County, CA
- EIA plant ID
- 65457
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CATH1 | Batteries | 100 MW · 400 MWh | 2024 | – |
| CATH2 | Batteries | 100 MW · 400 MWh | 2024 | – |
Questions
Cathode (Hinson) BESS, answered
How much can Cathode (Hinson) BESS store and deliver?
Cathode (Hinson) BESS can deliver up to 200 MW and hold 800 MWh of energy, from 2 storage units. Its net energy in 2025 was -38.3 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Cathode (Hinson) BESS?
Cathode (Hinson) BESS is in Los Angeles County, California, at about 33.776°, -118.200°. It is one of 254 power plants of 1 MW or more in the county. The average electricity customer in Los Angeles County goes 4.5 hours a year without power, the 41st most of 56 counties in California. The county's page has the full outage record.
Who operates Cathode (Hinson) BESS?
It is operated by Southern California Edison Co (EIA sector: Electric Utility), and it feeds the California ISO.
When did Cathode (Hinson) BESS open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.