Storage power plant · Riverside, CA
Crimson
Crimson is a 350 MW storage power plant in Riverside County, California, operated by RE Crimson LLC. Its oldest generator still running came online in 2022.
Crimson in context
Among the 156 storage plants in California in the EIA's inventory, it is the 6th largest, about 2.6% of the state's 13 GW of storage capacity.
Riverside County has 121 power plants of 1 MW or more with 11 GW in all; Crimson is 3% of that and the 2nd largest of 14 storage plants there.
The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
Crimson (outlined) and other plants in Riverside County, shaded. 33.573, -114.814.
Plant facts
- Operator
- RE Crimson LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Riverside County, CA
- EIA plant ID
- 65140
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SWSH1 | Batteries | 200 MW · 800 MWh | 2022 | – |
| SWSH2 | Batteries | 150 MW · 600 MWh | 2022 | – |
Questions
Crimson, answered
How much can Crimson store and deliver?
Crimson can deliver up to 350 MW and hold 1,400 MWh of energy, from 2 storage units. Its net energy in 2025 was -66.0 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Crimson?
Crimson is in Riverside County, California, at about 33.573°, -114.814°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Who operates Crimson?
It is operated by RE Crimson LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Crimson open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Methodology.