Solar power plant · Riverside, CA
McCoy Solar Energy Project Hybrid
McCoy Solar Energy Project Hybrid is a 501 MW solar power plant in Riverside County, California, operated by McCoy Solar, LLC. Its oldest generator still running came online in 2015. In 2025 it generated 639 GWh, about what 108,000 average California homes use in a year.
McCoy Solar Energy Project Hybrid in context
Among the 967 solar plants in California in the EIA's inventory, it is the 4th largest, about 1.6% of the state's 32 GW of solar capacity.
Riverside County has 121 power plants of 1 MW or more with 11 GW in all; McCoy Solar Energy Project Hybrid is 4% of that and the largest of 70 solar plants there.
Its capacity factor of 15% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
McCoy Solar Energy Project Hybrid (outlined) and other plants in Riverside County, shaded. 33.695, -114.740.
Plant facts
- Operator
- McCoy Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Riverside County, CA
- EIA plant ID
- 58462
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| MCST1 | Batteries | 230 MW · 920 MWh | 2021 | – |
| 1 | Solar Photovoltaic | 42 MW | 2016 | – |
| BLK7 | Solar Photovoltaic | 42 MW | 2016 | – |
| BLK3 | Solar Photovoltaic | 40 MW | 2016 | – |
| BLK8 | Solar Photovoltaic | 37 MW | 2015 | – |
| BLK4 | Solar Photovoltaic | 31 MW | 2015 | – |
| BLK5 | Solar Photovoltaic | 31 MW | 2015 | – |
| BLK6 | Solar Photovoltaic | 27 MW | 2015 | – |
| BLK2 | Solar Photovoltaic | 21 MW | 2016 | – |
Questions
McCoy Solar Energy Project Hybrid, answered
How much power does McCoy Solar Energy Project Hybrid produce?
McCoy Solar Energy Project Hybrid has 501 MW of capacity from 9 generators. In 2025 it generated 639 GWh, 15% of the most it could have made running flat out all year (its capacity factor).
How many homes does McCoy Solar Energy Project Hybrid power?
Its 2025 output of 639 GWh equals the yearly electricity use of about 108,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is McCoy Solar Energy Project Hybrid?
McCoy Solar Energy Project Hybrid is in Riverside County, California, at about 33.695°, -114.740°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Who operates McCoy Solar Energy Project Hybrid?
It is operated by McCoy Solar, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did McCoy Solar Energy Project Hybrid open?
Its oldest generator still running came online in 2015.