Solar power plant · Riverside, CA

McCoy Solar Energy Project Hybrid

McCoy Solar Energy Project Hybrid is a 501 MW solar power plant in Riverside County, California, operated by McCoy Solar, LLC. Its oldest generator still running came online in 2015. In 2025 it generated 639 GWh, about what 108,000 average California homes use in a year.

Capacity501 MWNameplate, September 2026
Generated639 GWhIn 2025
Capacity factor15%Share of the most it could make, 2025
Generators9Oldest from 2015

McCoy Solar Energy Project Hybrid in context

Among the 967 solar plants in California in the EIA's inventory, it is the 4th largest, about 1.6% of the state's 32 GW of solar capacity.

Riverside County has 121 power plants of 1 MW or more with 11 GW in all; McCoy Solar Energy Project Hybrid is 4% of that and the largest of 70 solar plants there.

Its capacity factor of 15% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020182019202020212022202320242025GWh 639
02004006008002019202120232025639

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

McCoy Solar Energy Project Hybrid (outlined) and other plants in Riverside County, shaded. 33.695, -114.740.

Plant facts

Operator
McCoy Solar, LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Riverside County, CA
EIA plant ID
58462
  • Solar271 MW54%
  • Storage230 MW46%
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
MCST1 Batteries 230 MW · 920 MWh 2021 –
1 Solar Photovoltaic 42 MW 2016 –
BLK7 Solar Photovoltaic 42 MW 2016 –
BLK3 Solar Photovoltaic 40 MW 2016 –
BLK8 Solar Photovoltaic 37 MW 2015 –
BLK4 Solar Photovoltaic 31 MW 2015 –
BLK5 Solar Photovoltaic 31 MW 2015 –
BLK6 Solar Photovoltaic 27 MW 2015 –
BLK2 Solar Photovoltaic 21 MW 2016 –

Questions

McCoy Solar Energy Project Hybrid, answered

How much power does McCoy Solar Energy Project Hybrid produce?

McCoy Solar Energy Project Hybrid has 501 MW of capacity from 9 generators. In 2025 it generated 639 GWh, 15% of the most it could have made running flat out all year (its capacity factor).

How many homes does McCoy Solar Energy Project Hybrid power?

Its 2025 output of 639 GWh equals the yearly electricity use of about 108,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is McCoy Solar Energy Project Hybrid?

McCoy Solar Energy Project Hybrid is in Riverside County, California, at about 33.695°, -114.740°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.

Who operates McCoy Solar Energy Project Hybrid?

It is operated by McCoy Solar, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did McCoy Solar Energy Project Hybrid open?

Its oldest generator still running came online in 2015.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.