Solar power plant · Riverside, CA
Arlington Energy Center II
Arlington Energy Center II is a 365 MW solar power plant in Riverside County, California, operated by Arlington Energy Center II. Its oldest generator still running came online in 2022. In 2025 it generated 634 GWh, about what 107,000 average California homes use in a year.
Arlington Energy Center II in context
Among the 967 solar plants in California in the EIA's inventory, it is the 14th largest, about 1.2% of the state's 32 GW of solar capacity.
Riverside County has 121 power plants of 1 MW or more with 11 GW in all; Arlington Energy Center II is 3% of that and the 6th largest of 70 solar plants there.
Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Arlington Energy Center II (outlined) and other plants in Riverside County, shaded. 33.691, -114.775.
Plant facts
- Operator
- Arlington Energy Center II
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Riverside County, CA
- EIA plant ID
- 64481
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| AEC2 | Solar Photovoltaic | 133 MW | 2023 | – |
| AEC2B | Batteries | 132 MW · 528 MWh | 2022 | – |
| AEC1 | Solar Photovoltaic | 100 MW | 2022 | – |
Questions
Arlington Energy Center II, answered
How much power does Arlington Energy Center II produce?
Arlington Energy Center II has 365 MW of capacity from 3 generators. In 2025 it generated 634 GWh, 20% of the most it could have made running flat out all year (its capacity factor).
How many homes does Arlington Energy Center II power?
Its 2025 output of 634 GWh equals the yearly electricity use of about 107,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Arlington Energy Center II?
Arlington Energy Center II is in Riverside County, California, at about 33.691°, -114.775°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Who operates Arlington Energy Center II?
It is operated by Arlington Energy Center II (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Arlington Energy Center II open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.