Oberon II Solar Project is a 375 MW solar power plant in Riverside County, California, operated by IPX Power USA, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 590 GWh, about what 99,000 average California homes use in a year.
Oberon II Solar Project in context
Among the 967 solar plants in California in the EIA's inventory, it is the 13th largest, about 1.2% of the state's 32 GW of solar capacity.
Riverside County has 121 power plants of 1 MW or more with 11 GW in all; Oberon II Solar Project is 3% of that and the 5th largest of 70 solar plants there.
Its capacity factor of 18% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Oberon II Solar Project (outlined) and other plants in Riverside County, shaded. 33.729, -115.382.
Plant facts
- Operator
- IPX Power USA, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Riverside County, CA
- EIA plant ID
- 65735
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| OBIIP | Solar Photovoltaic | 250 MW | 2023 | – |
| OBIIB | Batteries | 125 MW · 500 MWh | 2023 | – |
Questions
Oberon II Solar Project, answered
How much power does Oberon II Solar Project produce?
Oberon II Solar Project has 375 MW of capacity from 2 generators. In 2025 it generated 590 GWh, 18% of the most it could have made running flat out all year (its capacity factor).
How many homes does Oberon II Solar Project power?
Its 2025 output of 590 GWh equals the yearly electricity use of about 99,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Oberon II Solar Project?
Oberon II Solar Project is in Riverside County, California, at about 33.729°, -115.382°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Who operates Oberon II Solar Project?
It is operated by IPX Power USA, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Oberon II Solar Project open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.