Solar power plant · Riverside, CA
AP North Lake I, LP
AP North Lake I, LP is a 20 MW solar power plant in Riverside County, California, operated by AP North Lake I, LP. Its oldest generator still running came online in 2015. In 2025 it generated 46 GWh, about what 7,700 average California homes use in a year.
AP North Lake I, LP in context
Among the 967 solar plants in California in the EIA's inventory, it is the 206th largest, about 0.1% of the state's 32 GW of solar capacity.
Riverside County has 121 power plants of 1 MW or more with 11 GW in all; AP North Lake I, LP is 0% of that and the 27th largest of 70 solar plants there.
Its capacity factor of 26% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
AP North Lake I, LP (outlined) and other plants in Riverside County, shaded. 33.740, -117.011.
Plant facts
- Operator
- AP North Lake I, LP
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Riverside County, CA
- EIA plant ID
- 59610
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| APNLI | Solar Photovoltaic | 20 MW | 2015 | – |
Questions
AP North Lake I, LP, answered
How much power does AP North Lake I, LP produce?
AP North Lake I, LP has 20 MW of capacity from one generator. In 2025 it generated 46 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does AP North Lake I, LP power?
Its 2025 output of 46 GWh equals the yearly electricity use of about 7,700 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is AP North Lake I, LP?
AP North Lake I, LP is in Riverside County, California, at about 33.740°, -117.011°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Who operates AP North Lake I, LP?
It is operated by AP North Lake I, LP (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did AP North Lake I, LP open?
Its oldest generator still running came online in 2015.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.