Hydro power plant · Placer, CA
Drum 1
Drum 1 is a 49 MW hydro power plant in Placer County, California, operated by Pacific Gas & Electric Co.. Its oldest generator still running came online in 1913. In 2025 it generated 15 GWh, about what 2,500 average California homes use in a year.
Drum 1 in context
Among the 238 hydro plants in California in the EIA's inventory, it is the 57th largest, about 0.5% of the state's 10 GW of hydro capacity.
Placer County has 21 power plants of 1 MW or more with 773 MW in all; Drum 1 is 6% of that and the 4th largest of 13 hydro plants there.
Its capacity factor of 4% in 2025 is lower than the 34% typical for hydro plants across the US.
The average electricity customer in Placer County goes 9.6 hours a year without power, the 28th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Drum 1 (outlined) and other plants in Placer County, shaded. 39.257, -120.767.
Plant facts
- Operator
- Pacific Gas & Electric Co.
- Sector
- Electric Utility
- Grid operator
- CISO
- County
- Placer County, CA
- EIA plant ID
- 235
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 4 | Conventional Hydroelectric | 13 MW | 1928 | – |
| 1 | Conventional Hydroelectric | 12 MW | 1913 | – |
| 2 | Conventional Hydroelectric | 12 MW | 1913 | – |
| 3 | Conventional Hydroelectric | 12 MW | 1922 | – |
Questions
Drum 1, answered
How much power does Drum 1 produce?
Drum 1 has 49 MW of capacity from 4 generators. In 2025 it generated 15 GWh, 4% of the most it could have made running flat out all year (its capacity factor).
How many homes does Drum 1 power?
Its 2025 output of 15 GWh equals the yearly electricity use of about 2,500 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Drum 1?
Drum 1 is in Placer County, California, at about 39.257°, -120.767°. It is one of 21 power plants of 1 MW or more in the county. The average electricity customer in Placer County goes 9.6 hours a year without power, the 28th most of 56 counties in California. The county's page has the full outage record.
Who operates Drum 1?
It is operated by Pacific Gas & Electric Co. (EIA sector: Electric Utility), and it feeds the California ISO.
When did Drum 1 open?
Its oldest generator still running came online in 1913.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.