Natural gas power plant · Monterey, CA
Dynegy Moss Landing Power Plant Hybrid
Dynegy Moss Landing Power Plant Hybrid is a 1.8 GW natural gas power plant in Monterey County, California, operated by Dynegy -Moss Landing LLC. Its oldest generator still running came online in 2002. In 2025 it generated 2.1 TWh, about what 349,000 average California homes use in a year.
Dynegy Moss Landing Power Plant Hybrid in context
Among the 304 natural gas plants in California in the EIA's inventory, it is the largest, about 4.5% of the state's 41 GW of natural gas capacity.
Monterey County has 25 power plants of 1 MW or more with 2.4 GW in all; Dynegy Moss Landing Power Plant Hybrid is 77% of that and the largest of 8 natural gas plants there.
Its capacity factor of 13% in 2025 is lower than the 23% typical for natural gas plants across the US.
The average electricity customer in Monterey County goes 9.9 hours a year without power, the 27th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Dynegy Moss Landing Power Plant Hybrid (outlined) and other plants in Monterey County, shaded. 36.805, -121.782.
Plant facts
- Operator
- Dynegy -Moss Landing LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Monterey County, CA
- EIA plant ID
- 260
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BAT3 | Batteries | 350 MW · 1,400 MWh | 2023 | – |
| CT1A | Natural Gas Fired Combined Cycle | 233 MW | 2002 | – |
| CT1B | Natural Gas Fired Combined Cycle | 233 MW | 2002 | – |
| CT2A | Natural Gas Fired Combined Cycle | 233 MW | 2002 | – |
| CT2B | Natural Gas Fired Combined Cycle | 233 MW | 2002 | – |
| ST1 | Natural Gas Fired Combined Cycle | 233 MW | 2002 | – |
| ST2 | Natural Gas Fired Combined Cycle | 233 MW | 2002 | – |
| BAT2 | Batteries | 100 MW · 400 MWh | 2021 | – |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| 6 | Natural Gas Steam Turbine | 702 MW | 1967 | 2016 |
| 7 | Natural Gas Steam Turbine | 702 MW | 1968 | 2016 |
| BAT1 | Batteries | 300 MW | 2021 | 2025 |
Nearby
Other plants in Monterey County
Questions
Dynegy Moss Landing Power Plant Hybrid, answered
How much power does Dynegy Moss Landing Power Plant Hybrid produce?
Dynegy Moss Landing Power Plant Hybrid has 1.8 GW of capacity from 8 generators. In 2025 it generated 2.1 TWh, 13% of the most it could have made running flat out all year (its capacity factor).
How many homes does Dynegy Moss Landing Power Plant Hybrid power?
Its 2025 output of 2.1 TWh equals the yearly electricity use of about 349,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Dynegy Moss Landing Power Plant Hybrid?
Dynegy Moss Landing Power Plant Hybrid is in Monterey County, California, at about 36.805°, -121.782°. It is one of 25 power plants of 1 MW or more in the county. The average electricity customer in Monterey County goes 9.9 hours a year without power, the 27th most of 56 counties in California. The county's page has the full outage record.
Who operates Dynegy Moss Landing Power Plant Hybrid?
It is operated by Dynegy -Moss Landing LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Dynegy Moss Landing Power Plant Hybrid open?
Its oldest generator still running came online in 2002.