Natural gas power plant · Monterey, CA

Dynegy Moss Landing Power Plant Hybrid

Dynegy Moss Landing Power Plant Hybrid is a 1.8 GW natural gas power plant in Monterey County, California, operated by Dynegy -Moss Landing LLC. Its oldest generator still running came online in 2002. In 2025 it generated 2.1 TWh, about what 349,000 average California homes use in a year.

Capacity1.8 GWNameplate, September 2026
Generated2.1 TWhIn 2025
Capacity factor13%Share of the most it could make, 2025
Generators8Oldest from 2002

Dynegy Moss Landing Power Plant Hybrid in context

Among the 304 natural gas plants in California in the EIA's inventory, it is the largest, about 4.5% of the state's 41 GW of natural gas capacity.

Monterey County has 25 power plants of 1 MW or more with 2.4 GW in all; Dynegy Moss Landing Power Plant Hybrid is 77% of that and the largest of 8 natural gas plants there.

Its capacity factor of 13% in 2025 is lower than the 23% typical for natural gas plants across the US.

The average electricity customer in Monterey County goes 9.9 hours a year without power, the 27th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02,0004,0006,00020182019202020212022202320242025GWh 2,068
02,0004,0006,00020192021202320252,068

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Dynegy Moss Landing Power Plant Hybrid (outlined) and other plants in Monterey County, shaded. 36.805, -121.782.

Plant facts

Operator
Dynegy -Moss Landing LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Monterey County, CA
EIA plant ID
260
  • Natural gas1.4 GW76%
  • Storage450 MW24%
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BAT3 Batteries 350 MW · 1,400 MWh 2023 –
CT1A Natural Gas Fired Combined Cycle 233 MW 2002 –
CT1B Natural Gas Fired Combined Cycle 233 MW 2002 –
CT2A Natural Gas Fired Combined Cycle 233 MW 2002 –
CT2B Natural Gas Fired Combined Cycle 233 MW 2002 –
ST1 Natural Gas Fired Combined Cycle 233 MW 2002 –
ST2 Natural Gas Fired Combined Cycle 233 MW 2002 –
BAT2 Batteries 100 MW · 400 MWh 2021 –

Retired

GeneratorTechnologyCapacityOnlineRetired
6Natural Gas Steam Turbine702 MW19672016
7Natural Gas Steam Turbine702 MW19682016
BAT1Batteries300 MW20212025

Questions

Dynegy Moss Landing Power Plant Hybrid, answered

How much power does Dynegy Moss Landing Power Plant Hybrid produce?

Dynegy Moss Landing Power Plant Hybrid has 1.8 GW of capacity from 8 generators. In 2025 it generated 2.1 TWh, 13% of the most it could have made running flat out all year (its capacity factor).

How many homes does Dynegy Moss Landing Power Plant Hybrid power?

Its 2025 output of 2.1 TWh equals the yearly electricity use of about 349,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Dynegy Moss Landing Power Plant Hybrid?

Dynegy Moss Landing Power Plant Hybrid is in Monterey County, California, at about 36.805°, -121.782°. It is one of 25 power plants of 1 MW or more in the county. The average electricity customer in Monterey County goes 9.9 hours a year without power, the 27th most of 56 counties in California. The county's page has the full outage record.

Who operates Dynegy Moss Landing Power Plant Hybrid?

It is operated by Dynegy -Moss Landing LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Dynegy Moss Landing Power Plant Hybrid open?

Its oldest generator still running came online in 2002.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.