Storage power plant · Monterey, CA
Cal Flats BESS
Cal Flats BESS is a 60 MW storage power plant in Monterey County, California, operated by Arevon Energy, Inc.. Its oldest generator still running came online in 2021.
Cal Flats BESS in context
Among the 156 storage plants in California in the EIA's inventory, it is the 60th largest, about 0.4% of the state's 13 GW of storage capacity.
Monterey County has 25 power plants of 1 MW or more with 2.4 GW in all; Cal Flats BESS is 3% of that and the 2nd largest of 2 storage plants there.
The average electricity customer in Monterey County goes 9.9 hours a year without power, the 27th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
Cal Flats BESS (outlined) and other plants in Monterey County, shaded. 35.867, -120.329.
Plant facts
- Operator
- Arevon Energy, Inc.
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Monterey County, CA
- EIA plant ID
- 63930
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CF60 | Batteries | 60 MW · 242 MWh | 2021 | – |
Nearby
Other plants in Monterey County
Questions
Cal Flats BESS, answered
How much can Cal Flats BESS store and deliver?
Cal Flats BESS can deliver up to 60 MW and hold 242 MWh of energy, from one battery or storage system. Its net energy in 2025 was -11.0 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Cal Flats BESS?
Cal Flats BESS is in Monterey County, California, at about 35.867°, -120.329°. It is one of 25 power plants of 1 MW or more in the county. The average electricity customer in Monterey County goes 9.9 hours a year without power, the 27th most of 56 counties in California. The county's page has the full outage record.
Who operates Cal Flats BESS?
It is operated by Arevon Energy, Inc. (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Cal Flats BESS open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Methodology.