Cal Flats BESS is a 60 MW storage power plant in Monterey County, California, operated by Arevon Energy, Inc.. Its oldest generator still running came online in 2021.

Capacity60 MWNameplate, September 2026
Net energy-11.0 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2021

Cal Flats BESS in context

Among the 156 storage plants in California in the EIA's inventory, it is the 60th largest, about 0.4% of the state's 13 GW of storage capacity.

Monterey County has 25 power plants of 1 MW or more with 2.4 GW in all; Cal Flats BESS is 3% of that and the 2nd largest of 2 storage plants there.

The average electricity customer in Monterey County goes 9.9 hours a year without power, the 27th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.

01234520212022202320242025GWh -11
01234520212022202320242025-11

Where it is

Cal Flats BESS (outlined) and other plants in Monterey County, shaded. 35.867, -120.329.

Plant facts

Operator
Arevon Energy, Inc.
Sector
IPP Non-CHP
Grid operator
CISO
County
Monterey County, CA
EIA plant ID
63930
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CF60 Batteries 60 MW · 242 MWh 2021 –

Questions

Cal Flats BESS, answered

How much can Cal Flats BESS store and deliver?

Cal Flats BESS can deliver up to 60 MW and hold 242 MWh of energy, from one battery or storage system. Its net energy in 2025 was -11.0 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Cal Flats BESS?

Cal Flats BESS is in Monterey County, California, at about 35.867°, -120.329°. It is one of 25 power plants of 1 MW or more in the county. The average electricity customer in Monterey County goes 9.9 hours a year without power, the 27th most of 56 counties in California. The county's page has the full outage record.

Who operates Cal Flats BESS?

It is operated by Arevon Energy, Inc. (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Cal Flats BESS open?

Its oldest generator still running came online in 2021.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Methodology.