Solar power plant · Imperial, CA

Mount Signal Solar Farm II

Mount Signal Solar Farm II is a 154 MW solar power plant in Imperial County, California, operated by MN8 Energy LLC. Its oldest generator still running came online in 2020. In 2025 it generated 403 GWh, about what 68,000 average California homes use in a year.

Capacity154 MWNameplate, September 2026
Generated403 GWhIn 2025
Capacity factor30%Share of the most it could make, 2025
Generators1Oldest from 2020

Mount Signal Solar Farm II in context

Among the 967 solar plants in California in the EIA's inventory, it is the 69th largest, about 0.5% of the state's 32 GW of solar capacity.

Imperial County has 73 power plants of 1 MW or more with 4.6 GW in all; Mount Signal Solar Farm II is 3% of that and the 5th largest of 36 solar plants there.

Its capacity factor of 30% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Imperial County goes 4.4 hours a year without power, the 42nd most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01002003004005002019202020212022202320242025GWh 403
01002003004005002019202120232025403

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Mount Signal Solar Farm II (outlined) and other plants in Imperial County, shaded. 32.669, -115.629.

Plant facts

Operator
MN8 Energy LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Imperial County, CA
EIA plant ID
61353
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
IVS2 Solar Photovoltaic 154 MW 2020 –

Questions

Mount Signal Solar Farm II, answered

How much power does Mount Signal Solar Farm II produce?

Mount Signal Solar Farm II has 154 MW of capacity from one generator. In 2025 it generated 403 GWh, 30% of the most it could have made running flat out all year (its capacity factor).

How many homes does Mount Signal Solar Farm II power?

Its 2025 output of 403 GWh equals the yearly electricity use of about 68,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Mount Signal Solar Farm II?

Mount Signal Solar Farm II is in Imperial County, California, at about 32.669°, -115.629°. It is one of 73 power plants of 1 MW or more in the county. The average electricity customer in Imperial County goes 4.4 hours a year without power, the 42nd most of 56 counties in California. The county's page has the full outage record.

Who operates Mount Signal Solar Farm II?

It is operated by MN8 Energy LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Mount Signal Solar Farm II open?

Its oldest generator still running came online in 2020.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.