Solar power plant · Imperial, CA
Centinela Solar Energy
Centinela Solar Energy is a 175 MW solar power plant in Imperial County, California, operated by Centinela Solar Energy LLC. Its oldest generator still running came online in 2013. In 2025 it generated 449 GWh, about what 76,000 average California homes use in a year.
Centinela Solar Energy in context
Among the 967 solar plants in California in the EIA's inventory, it is the 61st largest, about 0.6% of the state's 32 GW of solar capacity.
Imperial County has 73 power plants of 1 MW or more with 4.6 GW in all; Centinela Solar Energy is 4% of that and the 3rd largest of 36 solar plants there.
Its capacity factor of 29% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Imperial County goes 4.4 hours a year without power, the 42nd most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Centinela Solar Energy (outlined) and other plants in Imperial County, shaded. 32.687, -115.648.
Plant facts
- Operator
- Centinela Solar Energy LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Imperial County, CA
- EIA plant ID
- 58430
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CSE1 | Solar Photovoltaic | 34 MW | 2013 | – |
| CSE3 | Solar Photovoltaic | 34 MW | 2013 | – |
| CSE4 | Solar Photovoltaic | 34 MW | 2013 | – |
| CSE2 | Solar Photovoltaic | 27 MW | 2013 | – |
| CSE6 | Solar Photovoltaic | 27 MW | 2014 | – |
| CSE5 | Solar Photovoltaic | 19 MW | 2014 | – |
Questions
Centinela Solar Energy, answered
How much power does Centinela Solar Energy produce?
Centinela Solar Energy has 175 MW of capacity from 6 generators. In 2025 it generated 449 GWh, 29% of the most it could have made running flat out all year (its capacity factor).
How many homes does Centinela Solar Energy power?
Its 2025 output of 449 GWh equals the yearly electricity use of about 76,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Centinela Solar Energy?
Centinela Solar Energy is in Imperial County, California, at about 32.687°, -115.648°. It is one of 73 power plants of 1 MW or more in the county. The average electricity customer in Imperial County goes 4.4 hours a year without power, the 42nd most of 56 counties in California. The county's page has the full outage record.
Who operates Centinela Solar Energy?
It is operated by Centinela Solar Energy LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Centinela Solar Energy open?
Its oldest generator still running came online in 2013.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.