Solar power plant · Imperial, CA

Centinela Solar Energy

Centinela Solar Energy is a 175 MW solar power plant in Imperial County, California, operated by Centinela Solar Energy LLC. Its oldest generator still running came online in 2013. In 2025 it generated 449 GWh, about what 76,000 average California homes use in a year.

Capacity175 MWNameplate, September 2026
Generated449 GWhIn 2025
Capacity factor29%Share of the most it could make, 2025
Generators6Oldest from 2013

Centinela Solar Energy in context

Among the 967 solar plants in California in the EIA's inventory, it is the 61st largest, about 0.6% of the state's 32 GW of solar capacity.

Imperial County has 73 power plants of 1 MW or more with 4.6 GW in all; Centinela Solar Energy is 4% of that and the 3rd largest of 36 solar plants there.

Its capacity factor of 29% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Imperial County goes 4.4 hours a year without power, the 42nd most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060020182019202020212022202320242025GWh 449
02004006002019202120232025449

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Centinela Solar Energy (outlined) and other plants in Imperial County, shaded. 32.687, -115.648.

Plant facts

Operator
Centinela Solar Energy LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Imperial County, CA
EIA plant ID
58430
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CSE1 Solar Photovoltaic 34 MW 2013 –
CSE3 Solar Photovoltaic 34 MW 2013 –
CSE4 Solar Photovoltaic 34 MW 2013 –
CSE2 Solar Photovoltaic 27 MW 2013 –
CSE6 Solar Photovoltaic 27 MW 2014 –
CSE5 Solar Photovoltaic 19 MW 2014 –

Questions

Centinela Solar Energy, answered

How much power does Centinela Solar Energy produce?

Centinela Solar Energy has 175 MW of capacity from 6 generators. In 2025 it generated 449 GWh, 29% of the most it could have made running flat out all year (its capacity factor).

How many homes does Centinela Solar Energy power?

Its 2025 output of 449 GWh equals the yearly electricity use of about 76,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Centinela Solar Energy?

Centinela Solar Energy is in Imperial County, California, at about 32.687°, -115.648°. It is one of 73 power plants of 1 MW or more in the county. The average electricity customer in Imperial County goes 4.4 hours a year without power, the 42nd most of 56 counties in California. The county's page has the full outage record.

Who operates Centinela Solar Energy?

It is operated by Centinela Solar Energy LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Centinela Solar Energy open?

Its oldest generator still running came online in 2013.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.