Storage power plant · Imperial, CA

Big Rock Solar Farm

Big Rock Solar Farm is a 200 MW storage power plant in Imperial County, California, operated by Big Rock ESS Assets, LLC. Its oldest generator still running came online in 2025.

Capacity200 MWNameplate, September 2026
Net energy-14.6 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Big Rock Solar Farm in context

Among the 156 storage plants in California in the EIA's inventory, it is the 15th largest, about 1.5% of the state's 13 GW of storage capacity.

Imperial County has 73 power plants of 1 MW or more with 4.6 GW in all; Big Rock Solar Farm is 4% of that and the 2nd largest of 5 storage plants there.

The average electricity customer in Imperial County goes 4.4 hours a year without power, the 42nd most of 56 counties in California. The county's page has the full outage record.

Where it is

Big Rock Solar Farm (outlined) and other plants in Imperial County, shaded. 32.733, -115.714.

Plant facts

Operator
Big Rock ESS Assets, LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Imperial County, CA
EIA plant ID
64636
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
92JTB Batteries 200 MW · 200 MWh 2025 –

Questions

Big Rock Solar Farm, answered

How much can Big Rock Solar Farm store and deliver?

Big Rock Solar Farm can deliver up to 200 MW and hold 200 MWh of energy, from one battery or storage system. Its net energy in 2025 was -14.6 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Big Rock Solar Farm?

Big Rock Solar Farm is in Imperial County, California, at about 32.733°, -115.714°. It is one of 73 power plants of 1 MW or more in the county. The average electricity customer in Imperial County goes 4.4 hours a year without power, the 42nd most of 56 counties in California. The county's page has the full outage record.

Who operates Big Rock Solar Farm?

It is operated by Big Rock ESS Assets, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Big Rock Solar Farm open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.