Natural gas power plant · Imperial, CA

El Centro Hybrid

El Centro Hybrid is a 388 MW natural gas power plant in Imperial County, California, operated by Imperial Irrigation District. Its oldest generator still running came online in 1952. In 2025 it generated 1.1 TWh, about what 184,000 average California homes use in a year.

Capacity388 MWNameplate, September 2026
Generated1.1 TWhIn 2025
Capacity factor32%Share of the most it could make, 2025
Generators7Oldest from 1952

El Centro Hybrid in context

Among the 304 natural gas plants in California in the EIA's inventory, it is the 35th largest, about 0.9% of the state's 41 GW of natural gas capacity.

Imperial County has 73 power plants of 1 MW or more with 4.6 GW in all; El Centro Hybrid is 9% of that and the largest of 4 natural gas plants there.

Its capacity factor of 32% in 2025 is higher than the 23% typical for natural gas plants across the US.

The average electricity customer in Imperial County goes 4.4 hours a year without power, the 42nd most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02004006008001,0001,20020182019202020212022202320242025GWh 1,090
02004006008001,0001,20020192021202320251,090

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

El Centro Hybrid (outlined) and other plants in Imperial County, shaded. 32.802, -115.540.

Plant facts

Operator
Imperial Irrigation District
Sector
Electric Utility
Grid operator
IID
County
Imperial County, CA
EIA plant ID
389
  • Natural gas358 MW92%
  • Storage30 MW7.7%
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
2A Natural Gas Fired Combined Cycle 90 MW 1993 –
4 Natural Gas Steam Turbine 82 MW 1968 2029
30 Natural Gas Fired Combined Cycle 66 MW 2012 –
31 Natural Gas Fired Combined Cycle 43 MW 2012 –
32 Natural Gas Fired Combined Cycle 43 MW 2012 –
2 Natural Gas Fired Combined Cycle 35 MW 1952 –
BESS Batteries 30 MW · 20 MWh 2016 –

Planned

GeneratorTechnologyCapacityExpected
RICE1Natural Gas Internal Combustion Engine19 MW2029
RICE2Natural Gas Internal Combustion Engine19 MW2029
RICE3Natural Gas Internal Combustion Engine19 MW2029
RICE4Natural Gas Internal Combustion Engine19 MW2029
RICE5Natural Gas Internal Combustion Engine19 MW2029
RICE6Natural Gas Internal Combustion Engine19 MW2029

Retired

GeneratorTechnologyCapacityOnlineRetired
3Natural Gas Steam Turbine50 MW19572010

Questions

El Centro Hybrid, answered

How much power does El Centro Hybrid produce?

El Centro Hybrid has 388 MW of capacity from 7 generators. In 2025 it generated 1.1 TWh, 32% of the most it could have made running flat out all year (its capacity factor).

How many homes does El Centro Hybrid power?

Its 2025 output of 1.1 TWh equals the yearly electricity use of about 184,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is El Centro Hybrid?

El Centro Hybrid is in Imperial County, California, at about 32.802°, -115.540°. It is one of 73 power plants of 1 MW or more in the county. The average electricity customer in Imperial County goes 4.4 hours a year without power, the 42nd most of 56 counties in California. The county's page has the full outage record.

Who operates El Centro Hybrid?

It is operated by Imperial Irrigation District (EIA sector: Electric Utility), and it feeds balancing authority IID.

When did El Centro Hybrid open?

Its oldest generator still running came online in 1952. Planned retirements are scheduled for 2029. 6 more generators are planned.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.