Storage power plant · San Bernardino, CA
Separator (Etiwanda) BESS
Separator (Etiwanda) BESS is a 113 MW storage power plant in San Bernardino County, California, operated by Southern California Edison Co. Its oldest generator still running came online in 2024.
Separator (Etiwanda) BESS in context
Among the 156 storage plants in California in the EIA's inventory, it is the 31st largest, about 0.8% of the state's 13 GW of storage capacity.
San Bernardino County has 129 power plants of 1 MW or more with 7.1 GW in all; Separator (Etiwanda) BESS is 2% of that and the 3rd largest of 6 storage plants there.
The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.
Where it is
Separator (Etiwanda) BESS (outlined) and other plants in San Bernardino County, shaded. 34.092, -117.534.
Plant facts
- Operator
- Southern California Edison Co
- Sector
- Electric Utility
- Grid operator
- CISO
- County
- San Bernardino County, CA
- EIA plant ID
- 65456
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SEPAR | Batteries | 113 MW · 450 MWh | 2024 | – |
Questions
Separator (Etiwanda) BESS, answered
How much can Separator (Etiwanda) BESS store and deliver?
Separator (Etiwanda) BESS can deliver up to 113 MW and hold 450 MWh of energy, from one battery or storage system. Its net energy in 2025 was -19.0 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Separator (Etiwanda) BESS?
Separator (Etiwanda) BESS is in San Bernardino County, California, at about 34.092°, -117.534°. It is one of 129 power plants of 1 MW or more in the county. The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.
Who operates Separator (Etiwanda) BESS?
It is operated by Southern California Edison Co (EIA sector: Electric Utility), and it feeds the California ISO.
When did Separator (Etiwanda) BESS open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.