Storage power plant · San Bernardino, CA

Separator (Etiwanda) BESS

Separator (Etiwanda) BESS is a 113 MW storage power plant in San Bernardino County, California, operated by Southern California Edison Co. Its oldest generator still running came online in 2024.

Capacity113 MWNameplate, September 2026
Net energy-19.0 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2024

Separator (Etiwanda) BESS in context

Among the 156 storage plants in California in the EIA's inventory, it is the 31st largest, about 0.8% of the state's 13 GW of storage capacity.

San Bernardino County has 129 power plants of 1 MW or more with 7.1 GW in all; Separator (Etiwanda) BESS is 2% of that and the 3rd largest of 6 storage plants there.

The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.

Where it is

Separator (Etiwanda) BESS (outlined) and other plants in San Bernardino County, shaded. 34.092, -117.534.

Plant facts

Operator
Southern California Edison Co
Sector
Electric Utility
Grid operator
CISO
County
San Bernardino County, CA
EIA plant ID
65456
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SEPAR Batteries 113 MW · 450 MWh 2024 –

Questions

Separator (Etiwanda) BESS, answered

How much can Separator (Etiwanda) BESS store and deliver?

Separator (Etiwanda) BESS can deliver up to 113 MW and hold 450 MWh of energy, from one battery or storage system. Its net energy in 2025 was -19.0 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Separator (Etiwanda) BESS?

Separator (Etiwanda) BESS is in San Bernardino County, California, at about 34.092°, -117.534°. It is one of 129 power plants of 1 MW or more in the county. The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.

Who operates Separator (Etiwanda) BESS?

It is operated by Southern California Edison Co (EIA sector: Electric Utility), and it feeds the California ISO.

When did Separator (Etiwanda) BESS open?

Its oldest generator still running came online in 2024.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.