Hydro power plant · San Bernardino, CA
Devil Canyon
Devil Canyon is a 276 MW hydro power plant in San Bernardino County, California, operated by California Dept. of Water Resources. Its oldest generator still running came online in 1972. In 2025 it generated 790 GWh, about what 133,000 average California homes use in a year.
Devil Canyon in context
Among the 238 hydro plants in California in the EIA's inventory, it is the 5th largest, about 2.7% of the state's 10 GW of hydro capacity.
San Bernardino County has 129 power plants of 1 MW or more with 7.1 GW in all; Devil Canyon is 4% of that and the largest of 9 hydro plants there.
Its capacity factor of 33% in 2025 is close to the 34% typical for hydro plants across the US.
The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Devil Canyon (outlined) and other plants in San Bernardino County, shaded. 34.206, -117.334.
Plant facts
- Operator
- California Dept. of Water Resources
- Sector
- Electric Utility
- Grid operator
- CISO
- County
- San Bernardino County, CA
- EIA plant ID
- 436
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 4 | Conventional Hydroelectric | 78 MW | 1992 | – |
| 3 | Conventional Hydroelectric | 78 MW | 1994 | – |
| 1 | Conventional Hydroelectric | 60 MW | 1972 | – |
| 2 | Conventional Hydroelectric | 60 MW | 1976 | – |
Questions
Devil Canyon, answered
How much power does Devil Canyon produce?
Devil Canyon has 276 MW of capacity from 4 generators. In 2025 it generated 790 GWh, 33% of the most it could have made running flat out all year (its capacity factor).
How many homes does Devil Canyon power?
Its 2025 output of 790 GWh equals the yearly electricity use of about 133,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Devil Canyon?
Devil Canyon is in San Bernardino County, California, at about 34.206°, -117.334°. It is one of 129 power plants of 1 MW or more in the county. The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.
Who operates Devil Canyon?
It is operated by California Dept. of Water Resources (EIA sector: Electric Utility), and it feeds the California ISO.
When did Devil Canyon open?
Its oldest generator still running came online in 1972.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.