Solar power plant · San Bernardino, CA
Baldy Mesa Solar & Storage
Baldy Mesa Solar & Storage is a 225 MW solar power plant in San Bernardino County, California, operated by AES Clean Energy. Its oldest generator still running came online in 2024. In 2025 it generated 297 GWh, about what 50,000 average California homes use in a year.
Baldy Mesa Solar & Storage in context
Among the 967 solar plants in California in the EIA's inventory, it is the 48th largest, about 0.7% of the state's 32 GW of solar capacity.
San Bernardino County has 129 power plants of 1 MW or more with 7.1 GW in all; Baldy Mesa Solar & Storage is 3% of that and the 5th largest of 91 solar plants there.
Its capacity factor of 15% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Baldy Mesa Solar & Storage (outlined) and other plants in San Bernardino County, shaded. 34.609, -117.454.
Plant facts
- Operator
- AES Clean Energy
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- San Bernardino County, CA
- EIA plant ID
- 66598
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BLDMS | Solar Photovoltaic | 150 MW | 2024 | – |
| BDMSS | Batteries | 75 MW · 300 MWh | 2024 | – |
Questions
Baldy Mesa Solar & Storage, answered
How much power does Baldy Mesa Solar & Storage produce?
Baldy Mesa Solar & Storage has 225 MW of capacity from 2 generators. In 2025 it generated 297 GWh, 15% of the most it could have made running flat out all year (its capacity factor).
How many homes does Baldy Mesa Solar & Storage power?
Its 2025 output of 297 GWh equals the yearly electricity use of about 50,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Baldy Mesa Solar & Storage?
Baldy Mesa Solar & Storage is in San Bernardino County, California, at about 34.609°, -117.454°. It is one of 129 power plants of 1 MW or more in the county. The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.
Who operates Baldy Mesa Solar & Storage?
It is operated by AES Clean Energy (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Baldy Mesa Solar & Storage open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.