Solar power plant · San Bernardino, CA
Daggett 2
Daggett 2 is a 313 MW solar power plant in San Bernardino County, California, operated by Daggett Solar Power 2 LLC. Its oldest generator still running came online in 2023. In 2025 it generated 519 GWh, about what 88,000 average California homes use in a year.
Daggett 2 in context
Among the 967 solar plants in California in the EIA's inventory, it is the 21st largest, about 1.0% of the state's 32 GW of solar capacity.
San Bernardino County has 129 power plants of 1 MW or more with 7.1 GW in all; Daggett 2 is 4% of that and the 2nd largest of 91 solar plants there.
Its capacity factor of 19% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Daggett 2 (outlined) and other plants in San Bernardino County, shaded. 34.861, -116.855.
Plant facts
- Operator
- Daggett Solar Power 2 LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- San Bernardino County, CA
- EIA plant ID
- 64851
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| DAGGP | Solar Photovoltaic | 182 MW | 2023 | – |
| DAGGB | Batteries | 131 MW · 5 MWh | 2023 | – |
Questions
Daggett 2, answered
How much power does Daggett 2 produce?
Daggett 2 has 313 MW of capacity from 2 generators. In 2025 it generated 519 GWh, 19% of the most it could have made running flat out all year (its capacity factor).
How many homes does Daggett 2 power?
Its 2025 output of 519 GWh equals the yearly electricity use of about 88,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Daggett 2?
Daggett 2 is in San Bernardino County, California, at about 34.861°, -116.855°. It is one of 129 power plants of 1 MW or more in the county. The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.
Who operates Daggett 2?
It is operated by Daggett Solar Power 2 LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Daggett 2 open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.