Solar power plant · Riverside, CA
Athos Solar Project
Athos Solar Project is a 250 MW solar power plant in Riverside County, California, operated by SE Athos I, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 700 GWh, about what 118,000 average California homes use in a year.
Athos Solar Project in context
Among the 967 solar plants in California in the EIA's inventory, it is the 39th largest, about 0.8% of the state's 32 GW of solar capacity.
Riverside County has 121 power plants of 1 MW or more with 11 GW in all; Athos Solar Project is 2% of that and the 11th largest of 70 solar plants there.
Its capacity factor of 32% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Athos Solar Project (outlined) and other plants in Riverside County, shaded. 33.751, -115.355.
Plant facts
- Operator
- SE Athos I, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Riverside County, CA
- EIA plant ID
- 63300
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| IPAT1 | Solar Photovoltaic | 250 MW | 2022 | – |
Questions
Athos Solar Project, answered
How much power does Athos Solar Project produce?
Athos Solar Project has 250 MW of capacity from one generator. In 2025 it generated 700 GWh, 32% of the most it could have made running flat out all year (its capacity factor).
How many homes does Athos Solar Project power?
Its 2025 output of 700 GWh equals the yearly electricity use of about 118,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Athos Solar Project?
Athos Solar Project is in Riverside County, California, at about 33.751°, -115.355°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Who operates Athos Solar Project?
It is operated by SE Athos I, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Athos Solar Project open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.