Java Solar, LLC is a 14 MW solar power plant in Kings County, California, operated by Java Solar, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 23 GWh, about what 3,800 average California homes use in a year.
Java Solar, LLC in context
Among the 967 solar plants in California in the EIA's inventory, it is the 275th largest, about 0.0% of the state's 32 GW of solar capacity.
Kings County has 52 power plants of 1 MW or more with 2.8 GW in all; Java Solar, LLC is 0% of that and the 22nd largest of 41 solar plants there.
Its capacity factor of 19% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Kings County goes 2.9 hours a year without power, the 51st most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Java Solar, LLC (outlined) and other plants in Kings County, shaded. 36.234, -119.816.
Plant facts
- Operator
- Java Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Kings County, CA
- EIA plant ID
- 65965
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| JAVA | Solar Photovoltaic | 14 MW | 2022 | – |
Questions
Java Solar, LLC, answered
How much power does Java Solar, LLC produce?
Java Solar, LLC has 14 MW of capacity from one generator. In 2025 it generated 23 GWh, 19% of the most it could have made running flat out all year (its capacity factor).
How many homes does Java Solar, LLC power?
Its 2025 output of 23 GWh equals the yearly electricity use of about 3,800 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Java Solar, LLC?
Java Solar, LLC is in Kings County, California, at about 36.234°, -119.816°. It is one of 52 power plants of 1 MW or more in the county. The average electricity customer in Kings County goes 2.9 hours a year without power, the 51st most of 56 counties in California. The county's page has the full outage record.
Who operates Java Solar, LLC?
It is operated by Java Solar, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Java Solar, LLC open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.