Solar power plant · Kings, CA
Chestnut
Chestnut is a 286 MW solar power plant in Kings County, California, operated by Chestnut Westside LLC. Its oldest generator still running came online in 2023. In 2025 it generated 378 GWh, about what 64,000 average California homes use in a year.
Chestnut in context
Among the 967 solar plants in California in the EIA's inventory, it is the 26th largest, about 0.9% of the state's 32 GW of solar capacity.
Kings County has 52 power plants of 1 MW or more with 2.8 GW in all; Chestnut is 10% of that and the 3rd largest of 41 solar plants there.
Its capacity factor of 15% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Kings County goes 2.9 hours a year without power, the 51st most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Chestnut (outlined) and other plants in Kings County, shaded. 36.160, -119.905.
Plant facts
- Operator
- Chestnut Westside LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Kings County, CA
- EIA plant ID
- 63849
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CHNUT | Solar Photovoltaic | 151 MW | 2023 | – |
| BESS1 | Batteries | 135 MW · 540 MWh | 2023 | – |
Questions
Chestnut, answered
How much power does Chestnut produce?
Chestnut has 286 MW of capacity from 2 generators. In 2025 it generated 378 GWh, 15% of the most it could have made running flat out all year (its capacity factor).
How many homes does Chestnut power?
Its 2025 output of 378 GWh equals the yearly electricity use of about 64,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Chestnut?
Chestnut is in Kings County, California, at about 36.160°, -119.905°. It is one of 52 power plants of 1 MW or more in the county. The average electricity customer in Kings County goes 2.9 hours a year without power, the 51st most of 56 counties in California. The county's page has the full outage record.
Who operates Chestnut?
It is operated by Chestnut Westside LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Chestnut open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.