Hydro power plant · Trinity, CA
Trinity
Trinity is a 140 MW hydro power plant in Trinity County, California, operated by U S Bureau of Reclamation. Its oldest generator still running came online in 1964. In 2025 it generated 551 GWh, about what 93,000 average California homes use in a year.
Trinity in context
Among the 238 hydro plants in California in the EIA's inventory, it is the 21st largest, about 1.4% of the state's 10 GW of hydro capacity.
Trinity County has 5 power plants of 1 MW or more with 153 MW in all; Trinity is 91% of that and the largest of 5 hydro plants there.
Its capacity factor of 45% in 2025 is higher than the 34% typical for hydro plants across the US.
The average electricity customer in Trinity County goes 20 hours a year without power, the 19th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Trinity (outlined) and other plants in Trinity County, shaded. 40.797, -122.763.
Plant facts
- Operator
- U S Bureau of Reclamation
- Sector
- Electric Utility
- Grid operator
- BANC
- County
- Trinity County, CA
- EIA plant ID
- 451
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 70 MW | 1964 | – |
| 2 | Conventional Hydroelectric | 70 MW | 1964 | – |
Nearby
Other plants in Trinity County
Questions
Trinity, answered
How much power does Trinity produce?
Trinity has 140 MW of capacity from 2 generators. In 2025 it generated 551 GWh, 45% of the most it could have made running flat out all year (its capacity factor).
How many homes does Trinity power?
Its 2025 output of 551 GWh equals the yearly electricity use of about 93,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Trinity?
Trinity is in Trinity County, California, at about 40.797°, -122.763°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Trinity County goes 20 hours a year without power, the 19th most of 56 counties in California. The county's page has the full outage record.
Who operates Trinity?
It is operated by U S Bureau of Reclamation (EIA sector: Electric Utility), and it feeds balancing authority BANC.
When did Trinity open?
Its oldest generator still running came online in 1964.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.