Solar power plant · San Diego, CA

Jacumba Solar Farm

Jacumba Solar Farm is a 20 MW solar power plant in San Diego County, California, operated by Invenergy Services LLC. Its oldest generator still running came online in 2017. In 2025 it generated 46 GWh, about what 7,800 average California homes use in a year.

Capacity20 MWNameplate, September 2026
Generated46 GWhIn 2025
Capacity factor26%Share of the most it could make, 2025
Generators1Oldest from 2017

Jacumba Solar Farm in context

Among the 967 solar plants in California in the EIA's inventory, it is the 235th largest, about 0.1% of the state's 32 GW of solar capacity.

San Diego County has 107 power plants of 1 MW or more with 5.1 GW in all; Jacumba Solar Farm is 0% of that and the 2nd largest of 33 solar plants there.

Its capacity factor of 26% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in San Diego County goes 3.3 hours a year without power, the 49th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020406020182019202020212022202320242025GWh 46
0204060201920212023202546

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Jacumba Solar Farm (outlined) and other plants in San Diego County, shaded. 32.621, -116.129.

Plant facts

Operator
Invenergy Services LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
San Diego County, CA
EIA plant ID
60947
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
Q644A Solar Photovoltaic 20 MW 2017 –

Questions

Jacumba Solar Farm, answered

How much power does Jacumba Solar Farm produce?

Jacumba Solar Farm has 20 MW of capacity from one generator. In 2025 it generated 46 GWh, 26% of the most it could have made running flat out all year (its capacity factor).

How many homes does Jacumba Solar Farm power?

Its 2025 output of 46 GWh equals the yearly electricity use of about 7,800 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Jacumba Solar Farm?

Jacumba Solar Farm is in San Diego County, California, at about 32.621°, -116.129°. It is one of 107 power plants of 1 MW or more in the county. The average electricity customer in San Diego County goes 3.3 hours a year without power, the 49th most of 56 counties in California. The county's page has the full outage record.

Who operates Jacumba Solar Farm?

It is operated by Invenergy Services LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Jacumba Solar Farm open?

Its oldest generator still running came online in 2017.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.