NextEra Westside PV is a 20 MW solar power plant in Fresno County, California, operated by Westside Solar, LLC. Its oldest generator still running came online in 2017. In 2025 it generated 26 GWh, about what 4,300 average California homes use in a year.
NextEra Westside PV in context
Among the 967 solar plants in California in the EIA's inventory, it is the 237th largest, about 0.1% of the state's 32 GW of solar capacity.
Fresno County has 105 power plants of 1 MW or more with 5.9 GW in all; NextEra Westside PV is 0% of that and the 20th largest of 73 solar plants there.
Its capacity factor of 15% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Fresno County goes 3.5 hours a year without power, the 48th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
NextEra Westside PV (outlined) and other plants in Fresno County, shaded. 36.382, -120.135.
Plant facts
- Operator
- Westside Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Fresno County, CA
- EIA plant ID
- 60981
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WS526 | Solar Photovoltaic | 20 MW | 2017 | – |
Questions
NextEra Westside PV, answered
How much power does NextEra Westside PV produce?
NextEra Westside PV has 20 MW of capacity from one generator. In 2025 it generated 26 GWh, 15% of the most it could have made running flat out all year (its capacity factor).
How many homes does NextEra Westside PV power?
Its 2025 output of 26 GWh equals the yearly electricity use of about 4,300 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is NextEra Westside PV?
NextEra Westside PV is in Fresno County, California, at about 36.382°, -120.135°. It is one of 105 power plants of 1 MW or more in the county. The average electricity customer in Fresno County goes 3.5 hours a year without power, the 48th most of 56 counties in California. The county's page has the full outage record.
Who operates NextEra Westside PV?
It is operated by Westside Solar, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did NextEra Westside PV open?
Its oldest generator still running came online in 2017.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.