Natural gas power plant · Contra Costa, CA
Richmond Cogen
Richmond Cogen is a 174 MW natural gas power plant in Contra Costa County, California, operated by Chevron Products Company-Richmond. Its oldest generator still running came online in 1992. In 2025 it generated 970 GWh, about what 164,000 average California homes use in a year.
Richmond Cogen in context
Among the 304 natural gas plants in California in the EIA's inventory, it is the 59th largest, about 0.4% of the state's 41 GW of natural gas capacity.
Contra Costa County has 40 power plants of 1 MW or more with 4.2 GW in all; Richmond Cogen is 4% of that and the 6th largest of 11 natural gas plants there.
Its capacity factor of 64% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Contra Costa County goes 4.6 hours a year without power, the 40th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Richmond Cogen (outlined) and other plants in Contra Costa County, shaded. 37.942, -122.391.
Plant facts
- Operator
- Chevron Products Company-Richmond
- Sector
- Industrial CHP
- Grid operator
- CISO
- County
- Contra Costa County, CA
- EIA plant ID
- 52109
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Natural Gas Fired Combined Cycle | 63 MW | 1992 | – |
| GEN2 | Natural Gas Fired Combined Cycle | 63 MW | 1992 | – |
| GEN5 | Natural Gas Fired Combined Cycle | 30 MW | 2006 | – |
| GEN6 | All Other | 18 MW | 2019 | – |
Nearby
Other plants in Contra Costa County
Questions
Richmond Cogen, answered
How much power does Richmond Cogen produce?
Richmond Cogen has 174 MW of capacity from 4 generators. In 2025 it generated 970 GWh, 64% of the most it could have made running flat out all year (its capacity factor).
How many homes does Richmond Cogen power?
Its 2025 output of 970 GWh equals the yearly electricity use of about 164,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Richmond Cogen?
Richmond Cogen is in Contra Costa County, California, at about 37.942°, -122.391°. It is one of 40 power plants of 1 MW or more in the county. The average electricity customer in Contra Costa County goes 4.6 hours a year without power, the 40th most of 56 counties in California. The county's page has the full outage record.
Who operates Richmond Cogen?
It is operated by Chevron Products Company-Richmond (EIA sector: Industrial CHP), and it feeds the California ISO.
When did Richmond Cogen open?
Its oldest generator still running came online in 1992.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.