Natural gas power plant · Los Angeles, CA

El Segundo Cogen

El Segundo Cogen is a 180 MW natural gas power plant in Los Angeles County, California, operated by Chevron USA Inc-El Segundo. Its oldest generator still running came online in 1987. In 2025 it generated 1.2 TWh, about what 205,000 average California homes use in a year.

Capacity180 MWNameplate, September 2026
Generated1.2 TWhIn 2025
Capacity factor77%Share of the most it could make, 2025
Generators6Oldest from 1987

El Segundo Cogen in context

Among the 304 natural gas plants in California in the EIA's inventory, it is the 57th largest, about 0.4% of the state's 41 GW of natural gas capacity.

Los Angeles County has 254 power plants of 1 MW or more with 14 GW in all; El Segundo Cogen is 1% of that and the 14th largest of 52 natural gas plants there.

Its capacity factor of 77% in 2025 is higher than the 23% typical for natural gas plants across the US.

The average electricity customer in Los Angeles County goes 4.5 hours a year without power, the 41st most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05001,0001,50020182019202020212022202320242025GWh 1,217
05001,0001,50020192021202320251,217

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

El Segundo Cogen (outlined) and other plants in Los Angeles County, shaded. 33.906, -118.403.

Plant facts

Operator
Chevron USA Inc-El Segundo
Sector
Industrial CHP
Grid operator
CISO
County
Los Angeles County, CA
EIA plant ID
10213
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN1 Natural Gas Fired Combined Cycle 42 MW 1987 –
GEN2 Natural Gas Fired Combined Cycle 42 MW 1987 –
GEN7 Natural Gas Fired Combined Cycle 41 MW 2013 –
GEN5 Natural Gas Fired Combined Cycle 40 MW 1996 –
GEN6 Natural Gas Fired Combined Cycle 9.1 MW 1996 –
GEN8 Natural Gas Fired Combined Cycle 5.2 MW 2013 –

Questions

El Segundo Cogen, answered

How much power does El Segundo Cogen produce?

El Segundo Cogen has 180 MW of capacity from 6 generators. In 2025 it generated 1.2 TWh, 77% of the most it could have made running flat out all year (its capacity factor).

How many homes does El Segundo Cogen power?

Its 2025 output of 1.2 TWh equals the yearly electricity use of about 205,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is El Segundo Cogen?

El Segundo Cogen is in Los Angeles County, California, at about 33.906°, -118.403°. It is one of 254 power plants of 1 MW or more in the county. The average electricity customer in Los Angeles County goes 4.5 hours a year without power, the 41st most of 56 counties in California. The county's page has the full outage record.

Who operates El Segundo Cogen?

It is operated by Chevron USA Inc-El Segundo (EIA sector: Industrial CHP), and it feeds the California ISO.

When did El Segundo Cogen open?

Its oldest generator still running came online in 1987.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.